Durable Goods - Furniture
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sabrina Cescolini on
We are working with a project building that is a large convention center and event hall, with some permanent offices. For MRc2.2.
MPR 6 Compliance through a different Portfolio manager
posted by Vinsu Shah on
In regards to what was briefly discussed in the Q&A portion, will LEED accept access to a different portfolio manager instead of the Energy Star Portfolio Manager?
Sealant VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Holdenried on
For a product that "does not contain isocyanates, silicone, solvent or acids" does this mean there are 0 VOCs? Or are there other compounds that could be present that contain VOCs?
How do I calculate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by adi ashkenazi on
Hello I'm working on an exclusive residential project (NC) that contains a resident- only-access pool and gym. In my calculations I considered around 1400 residents and about 10 staff.
Use of "Offsite" sources of nonpotable water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ahmed Mosa on
i understand the focus of the credit is water efficiency of the installed fixtures but can "Offsite" sources of nonpotable water such as captured rainwater, graywater, air conditioner condensate, c
Does LEED look at the overall budget only or at each fixture?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ahmed Mosa on
In one of our projects " a Hotel " the client is keen to use water-saving fixtures but not Shower-heads, can we exceed the baseline in this fixture but balance it with others to achieve the 20%?
Feel like being penalized by not providing carpark on site
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by William Wong on
There are quite some LEED credits relate to carpark provisions within project building. Obvious those are SSc 4.3, SSc 4.4 and SSc 7.1.
100% Green energy supply contract
CI-2009 EAc4:Green Powerposted by Esther Izquierdo on
Hi, After reading all comments I'm still not clear about the following, I hope you can help me: - We have not gone through the building simulation route in EAC1.3, so in principle we would need to
The building will provide
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
The building will provide entrance mats for all major entrances. The building have retail units at the ground floor. Do each of those units have to have mats as well?
When will V4 roll out
posted by David Wood on
I have been searching and cannot find when this begins (if there is even a date) I am mostly interested in EBOM.