Missed it by a year!
posted by Silvia Ruiz on
Studio Domus designed the first LEED certified project in Guatemala, which was awarded certification in April 2012... Very cool initiative!
First come, first served?
posted by David Eldridge on
Since the announcement refers to "certified" rather than registered it appears that the first project to complete will be refunded their applications fees, not necessarily the first registered proj
Frankenstein Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Brett Beckemeyer on
I am currently working on a project that has had 7 different additions dating back to 1956.
Rodent bait traps
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Sheryl Swartzle on
Our project does not have a problem with rodents but should one occur the contracted pest management company would use Havaheart traps, then remove rodents and release in appropriate areas instead
Is it possible to modify a LEED boundary already registered?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mauricio J Perez R on
Dear all, We are developing the design phase of a LEED Project which is already registered in the LEED online.
Moveable Walls for Views Calculations?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Joanne Sawatzky on
Are moveable walls considered open or closed for Views calculations? I read furniture and partitions are not included: Does furniture need to be included in floor plan when completing views calcul
First in Africa ?
posted by Mike Barker on
We have Africa's first LEED 2009 NC Gold in the bag, as well as Africa's greenest factory ( LEED Silver ).
Baseline system types and building area
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft.
LEED EBOM on Industrial Buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita
Shuttle takes 10min or less to get to the first bus stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Marcio Alberto Casado Pereira on
Hi, I was wondering if I can get this credit if my shuttle stops at a bus stop 10min or less after it departs from the project.