Forum quick links
Tile Crack Prevention Underlay
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by L W on
Do crack-prevention self-adhering underlays under tile fall under the LEED 4.3 scope? Do they need to be FloorScore Certified? Thanks in advance,
Off-grid Project in Mexico
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Jeremy Kuhre on
We are currently evaluating an off-grid hospitality project in Mexico. The project is primarily powered by a 32kW PV array which is sometimes supplemented by a propane generator.
LPB for a Residential Building Excluding the Shopping Mall
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Orçun Özhelvaci on
Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr
floor area for PIf3 vs IEQc8
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Ward Miller on
We received Construction Review comments that the areas reported in PIf3 do not correspond to the areas in IEQc8.
Applicable or not
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Catherine Blakemore on
My project has one floor that does not have any individual workstations. All the spaces are multi-purpose spaces.
LEED v2009 NC Total Daily Occupancy - Help Please!
NC-2009 PIf3:Occupant and Usage Dataposted by A Commings on
I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy.
New requirements in Version 5.0 form for LEED-EB: O&M v3/2009?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Peter Dahl on
I’m seeing Version 5.0 of the IEQp1 form for LEED-EB: O&M appear in some of my projects.
Cool Initiative
posted by Kathryn West on
I call dibs on the Bahamas and Maldives! :) I'm surprised the Maldives haven't documented LEED compliance for any buildings they are very eco-friendly.
Wood waste to be recycled into biomass fuel
NC-2009 MRc2:Construction Waste Managementposted by Noriko Nagazumi on
Hi, Our project emits a certain volume of wood waste, which is used mainly for packaging equipment.
Design review appeal
posted by Inés Alomar on
We have been denied a prerequisite from the Design Phase after the second review, and now we need to appeal them or start with the construction review. We have two main questions: Do we have any ti