Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Signage for display inside Gold certified office building

General forums
posted by  Jeff Zunt  on 

I'm looking for great examples of sign packages that were developed and displayed in buildings that identify the LEED credits achieved throughout the building and how they were achieved.

0
1
Tue Nov 5, 2013, 5:09 pm

Feed-in tariffs

CS-2009 EAp2:Minimum Energy Performance
posted by  BH .  on 

Hi, Hi, in EU most countries have feed-in-tarriffs, which reimburse the owner for energy produced at a higher rate than the cost of energy.

1
Mon May 6, 2013, 3:22 pm

Ongoing Cx Requirements

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Colleen Collins  on 

I have a question regarding EA2.3 As I understand it, it appears that the ongoing Cx process effectively begins with EAc2.1 and EAc2.2.

1
Thu Nov 7, 2013, 9:16 pm

EA prereq documentation

NC-2009 EAp2:Minimum Energy Performance
posted by  Mike Decoster  on 

We have documented EA prereq 2. We are using LEED NC v 2009 and we are using form version 4. We have filled in all the required information with the exception of the Target Finder.

1
Mon May 6, 2013, 7:37 pm

Mixed Ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Paula Hernandez  on 

Hello Everybody, I have this Project, which main activity is store and move packages.

1
Mon Nov 4, 2013, 2:03 am

LEEDUser vs. USGBC

Pilot-Credits PC34:Design for Adaptability
posted by  Nicholas Swinehart  on 

There are discrepancies between the LEEDUser and USGBC requirements for this pilot credit.

1
Tue Nov 5, 2013, 5:56 pm

MPR 2 - Separate Ownership

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jonathan Weiss  on 

I am curious about the separate function AND ownership requirement for an addition to a non-certified building.

1
Tue Nov 5, 2013, 3:19 pm

Partial Load Calculations & Fan Sizing

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Nick Chiarelli  on 

Hello, This project is 12 floors served by base building AHU's, pumps, chillers, etc.

1
Thu May 9, 2013, 1:29 pm

Requirements clarification

Healthcare-v2009 IEQc2:Acoustic environment
posted by  BABAR MEHMOOD  on 

What i understand from this credit is it has 2 portions. On is regarding the sound isolation alongwith the room noise and additional points will be given if comply with the acoustical finishes.

1
Wed May 8, 2013, 1:45 pm