Forum quick links
Where can I find the April 2010 addenda?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Jill Kowalski on
The link (on LEED user takes me to a LEED overview page and when I search "addenda" for IEQ 4.3 nothing comes up.
How to take account of the roof skylight with the calculation?
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Shenhao Li on
We have a high rise commercial office building project is going to pursue LEED CS certification. And I have two questions for the heat island effect calculation need your kindly help: 1.
Fire Door Cores
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Francis Porter on
A supplier is claiming that it is not possible to have a fire door core without added urea formaldehyde. Has anybody got experiance with compliance regarding this product? All feedback welcome.
3D Printer and Laser Cutter
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Silvia Ruiz on
Hi, Would a room containing a 3D Printer and Laser Cutter be considered a hazardous gas and chemical use area? Thanks for your help!
Process Load or Regulated Load
NC-2009 EAc1:Optimize Energy Performanceposted by Erin Nuckols on
In the case of a museum, is the humidification of a structure considered process load or regulated load?
ASHRAE 90.1 Mandatory provisions within the LEED ND boundary
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Karyn Rodrigues on
I have two situations: The first, a “LEED ND boundary” comprising many buildings, sidewalks and public parks.
G.3.1.3.14
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
As baseline model I have to model a System 6.
heat isalnd effect because of wall
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Amar Nath on
Hi, I am just curious to know wether LEED accounts for heat island effect that takes place because of wall just like roof ? If not then any logical reason?
Toilets not within the tenant space
CI-2009 WEc1:Water Use Reductionposted by Mike D on
For WE Prerequisite 1 and WE credit 1, should toilets that are not within the tenant space be included in the calculations? If not, how do we complete the online form as it marks incomplete when th
"Keep Calm and Do Your Homework"
posted by Deborah Lucking on
It's heartening to learn that GBCI is improving it's customer service and support. I strongly recommend that these two GBCI teams navigate a project through the process themselves.