Question from Contractor re Window Assembly

NC-2009 MRc5:Regional Materials
posted by  Brooks Critchfield  on 

Our GC requested that I post a clarifying question for him about the windows on our project-- If the Maker of the window components ships the window components to the Installer and the Installer a

1
Fri Aug 31, 2012, 2:58 pm

Core Performance Guide and IECC Supplement

NC-2009 EAp2:Minimum Energy Performance
posted by  Mitch Gascoyne  on 

Does anyone have any experience applying the core performance guide under option 3? I'm wondering which version of the guide we're supposed to use.

1
Thu Aug 23, 2012, 4:38 pm

Recertification LEED Online v3 Registration

LEED Recertification: When and How
posted by  Alicia Chu  on 

Has anyone successfully registered a project for recertification that was previously certified under LEED Online v3?

1
Wed Aug 15, 2012, 6:36 pm

EA Prerquisite 2 compliance for International Project

CI-2009 EAp2:Minimum Energy Performance
posted by  gustavo goldman  on 

Due to restrictions of the imports set by the National Government early this year, there are no HVAC systems

1
Wed Aug 15, 2012, 7:21 pm

Proposed Design HVAC Capacities

NC-2009 EAp2:Minimum Energy Performance
posted by  AshLee Eustace  on 

Should heating and cooling capacities for the proposed design be modeled the same as the baseline (15% and 25% over-sized) or should they be modeled with actual capacities? Thank you

1
Wed Aug 15, 2012, 8:52 pm

Table G3.1 Design Model Requirement

NC-2009 EAc1:Optimize Energy Performance
posted by  Omer Moltay  on 

Hi, We are modeling an office building in Moscow. There are large underground parking levels that are heated.

1
Wed Aug 15, 2012, 9:23 pm

comingled = diverted on MRc2 form?

CI-2009 MRc2:Construction Waste Management
posted by  Anna Barton, LEED AP BD+C  on 

The sentence right above the CI 2009 MRc2 chart clearly says: 'Documentation is required for commingled waste only' but this requirement also seems to apply to 'diverted' waste (by further defini

1
Mon Aug 20, 2012, 6:11 pm

Water pressure 60psi for a single floor building??

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Marcio Alberto Casado Pereira  on 

Hi folks, This prerequisite says that the baseline water flow for lavotory and showerheads should be measured at 60psi and 80psi respectively.

1
Mon Aug 27, 2012, 4:42 pm

ASHRAE Standard 55-2012 Comfort Model

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  John Kitsalis  on 

I am using the program above to document IEQc7.1 There is an option for me to calculate the MRT for an individual room. In the project I am working on, I have multiple rooms.

1
Thu Aug 23, 2012, 3:55 pm

CO2 sensor alarm when conditions vary 10%

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Saju Varghese  on 

The credit template requires the CO2 sensors to be programmed to generate an alarm when the conditions vary by 10% or more from the design value.

1
Fri Aug 17, 2012, 1:09 pm