Forum quick links
ENVIRONMENTAL FLUIDS
posted by Robert Marsh on
Environmental fluids plays a very important role in cleaning activity especially when it comes to home cleaning, various things has to be taken care of and so does environmental responsibility shou
Baseline for Advance Metering
EBOM-v4 EAc5:Advanced energy meteringposted by Patricia Andrasik on
If portfolio manager is used to develop an energy baseline for both demand and consumption for Advanced Metering, is this baseline different from the one developed in the prere
Can double-stacked bike storage racks comply with this credit?
NC-v4 LTc6:Bicycle facilitiesposted by Olga Yuil on
Can double-stacked bike storage racks comply with this credit?
Bussiness Transport serving the users of the project.
CS-v4 LTc5:Access to quality transitposted by Víctor Ramírez Orozco on
We are assessing a project that is in an industrial park far away from the city.
Several Similar Products EPDs
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Gamaliel Hernandez on
About the MRc2 Op 1 Environmental Product Declaration, to my knowledge if you have an EPD type III (specific product) it counts as one single product. Right?
Division of Building in a Core and Shell Project
CS-v4 MPR2:Must use reasonable LEED boundariesposted by MERVE AYGENC on
Dear all,
LEED LCA for Southeast Asian countries
NC-v4 MRc1:Building life-cycle impact reductionposted by Bosco Fan on
Has anyone ever been successful with LEED LCA credit for Asian region where there are not many EPDs or database on the regional materials?
Quick EV charger
NC-v4 LTc8:Green vehiclesposted by Noriko Nagazumi on
Hello, We understand that EV charger with capacity to make a car full charged in 8 hours could be counted as one under v2009, so quick charger which has capacity of charging a car to full in 2 hou
Exterior Contamination Prevention
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Lewis Hewton on
So if I'm reading the requirements correctly, to claim Option 2 the project must ensure through the results of computational fuid dynamics modeling, Gaussian dispersion analyses, wind tunn