Forum quick links
Clarification on Option 01 50% Saving - WEc1 - Water Efficient Landscaping
NC-2009 WEc1:Water Efficient Landscapingposted by SAMY Chamy on
Dear all :-
we are working in a project with 100% non potable water (On site recycling water 0 using for both Flushing fixture and Irrigation)
adhesive for sheet vinyl
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Deborah Lucking on
We have a project that requires sheet vinyl flooring that is "static dissipative and static conductive". The conductive adhesive has 56 g/L VOC.
theatre/music/ event room in hotel project
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Natalia Kwiecinska on
Hi everyone,
I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help.
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
Distance to main entrance from long term storage of bikes
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hi,
shower location in adjacent building
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hello,
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
General questions about registration in LEED online
posted by Konstantina Kalliakoudi on
Hello to all,
I have following questions concerning the leed online platform.
Enhanced Cx Option 2 Envelope Commissioning Requirements
NC-v4 EAc1:Enhanced commissioningposted by Krystina Kattermann on
Hi folks,
Notes from the First SCL Summit
posted by Nadav Malin on
I really appreciated our day on Tuesday--seems that we had a great inaugural Summit, and covered a lot of important ground.