Split System - for the refrigerant charge calculation

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Hendrick Munoz  on 

Which part of a Split System should be considered for the refrigerant charge calculation?

1
Wed Feb 27, 2019, 10:10 am

Does vegetated roof need to be acessible to the building occupants

CS-v4 SSc3:Open space
posted by  Malin Folkesson  on 

Does the vegetated roof  need to be acessible to building occupants  to count towards the 25 % vegetated  space?

1
Tue Feb 26, 2019, 6:17 pm

Regional credit in Argentina

CS-2009 RPc1:Regional Priority
posted by  Ines Fischer  on 

Hello Everyone!

I wanted to know with what percentaje of water savings do I have access to the regional extra credit in Argentina? 

Is it 1 credit? 

 

0

Process energy clarification

NC-v4 EAc2:Optimize energy performance
posted by  MAUDE PINTAL  on 

Hi,

Is heated sidewalk considered as process energy ?

Thank you, 

1
Tue Feb 26, 2019, 4:24 pm

Construction Waste Management Core and Shell and Tenant Upfit Spaces

CS-v4 MRc5:Construction and demolition waste management
posted by  Summer Minchew  on 

Can a Core and Shell project include tenant construction debris in overall CWM calculations? Often tenant construction is concurrent with core and shell construction.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 26, 2019, 6:22 am
3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Feb 26, 2019, 6:00 am
4
Mon Feb 25, 2019, 11:35 pm

Filling out the C&D waste Calculator

NC-v4 MRc5:Construction and demolition waste management
posted by  Jenelle Shapiro  on 

1) Are there distinct differences between material description and material type?

13
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Feb 25, 2019, 11:34 pm

Credit For Demolished Concrete for use as backfill

NC-v4 MRc5:Construction and demolition waste management
posted by  Chad Van Drie  on 

Previously, We have been a part of projects in which LEED credit has been given for the re-use of concrete, both structural and flat work, used to backfill an old gravel pit.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Feb 25, 2019, 11:33 pm