Forum quick links
Split System - for the refrigerant charge calculation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Hendrick Munoz on
Which part of a Split System should be considered for the refrigerant charge calculation?
Winter Summit report is out! (And webinar next Friday)
posted by Nadav Malin on
Hi folks,
Does vegetated roof need to be acessible to the building occupants
CS-v4 SSc3:Open spaceposted by Malin Folkesson on
Does the vegetated roof need to be acessible to building occupants to count towards the 25 % vegetated space?
Regional credit in Argentina
CS-2009 RPc1:Regional Priorityposted by Ines Fischer on
Hello Everyone!
I wanted to know with what percentaje of water savings do I have access to the regional extra credit in Argentina?
Is it 1 credit?
Process energy clarification
NC-v4 EAc2:Optimize energy performanceposted by MAUDE PINTAL on
Hi,
Is heated sidewalk considered as process energy ?
Thank you,
Construction Waste Management Core and Shell and Tenant Upfit Spaces
CS-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
Can a Core and Shell project include tenant construction debris in overall CWM calculations? Often tenant construction is concurrent with core and shell construction.
End Energy Use Cost Consumption Air Cooled Vs Water Cooled Chiller
NC-v4 EAp2:Minimum energy performanceposted by Junaid Naseer on
Dear All,
Exclusion of supporting buildings from LEED boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Tan on
Dear all,
Filling out the C&D waste Calculator
NC-v4 MRc5:Construction and demolition waste managementposted by Jenelle Shapiro on
1) Are there distinct differences between material description and material type?
Credit For Demolished Concrete for use as backfill
NC-v4 MRc5:Construction and demolition waste managementposted by Chad Van Drie on
Previously, We have been a part of projects in which LEED credit has been given for the re-use of concrete, both structural and flat work, used to backfill an old gravel pit.