Mandatory Requirements and Applicable Exceptions: Section 8.1.5

CI-v4 EAp2:Minimum energy performance
posted by  Waleed AlGhamdi  on 

In a LEED v4 CI project, we have a floor that will architecturally stay the same. New HVAC and new lighting fixtures (same ceiling and placement though).

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 28, 2019, 3:00 pm
2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Jun 28, 2019, 1:57 am

Daylight simulation

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Danielle Waters  on 

If a project is running a simulation that shows the LUX color levels for each room on the plan, would the project have to still fill out a v2009 Daylight calculator?

0

Interior Reuse - shared walls with other businesses

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Lou Niles II  on 

Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.

0
5
Thu Jun 27, 2019, 3:29 pm

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6:Bicycle facilities
posted by  Marion THIBAULT  on 

Hi,

 

Do we have minimum requirements for the size and configuration of changing facility shower ?

 

Thanks
Marion

0

Core and shell building’s energy

CS-v4 EAc5:Renewable energy production
posted by  Devendra Chaughule  on 

Dear All,

We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.