Topic | Recent |
---|---|
Should I consider in this Prerequisite also the Restrooms?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Claudia Rieger on Jul 8, 2010, 2:07 pm
Hi everybody, Now, let´s go to the question, I have a single... Last reply: Carrie Lai, Jul 22, 2010, 10:43 pm |
|
E1 E0 woodCI-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Vivian Wan on Jul 23, 2010, 4:01 am
do you know whether E1 and E0... Last reply: Tristan Roberts, Jul 23, 2010, 11:00 am |
|
A Unique Situation for an AdditionNC-2009 SSc7.1: Heat island effect - nonroofposted by Michael Kros on Jul 22, 2010, 2:27 pm
We are working on getting an addition certified under version 3.0 that is being added onto an original... Last reply: Michael Kros, Jul 23, 2010, 3:13 pm |
|
looking for this in LEED Reference GuidesGeneral forumsposted by Tristan Roberts on Jul 24, 2010, 12:16 am
Patrick, where are you seeing this? I'm looking at page 370 of the BD&C Reference Guide, and page 244 of the ID&C Reference Guide, and seeing them both reference ISO 14021. Both are LEED... |
|
Designating a CxASchools-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Terry Squyres on Jul 21, 2010, 12:41 pm
Does the... Last reply: Tristan Roberts, Jul 24, 2010, 12:20 am |
|
Views for tennacies in CSCS-2009 IEQc8.2: Daylight and views - viewsposted by Ricardo Sobral on Jul 21, 2010, 2:59 pm
I would like to know if spaces for leasing, which are not part of the core & shell of the building, are requiered to have access to views, specially tennancies for commercial retail at ground... Last reply: Tristan Roberts, Jul 24, 2010, 12:33 am |
|
Calibration?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by John Beeson on Jul 15, 2010, 5:17 pm
The Rating System calls out to "Calibrate meters within the manufacturer’s recommended interval if the building owner, management organization or tenant owns the meter. Meters owned by third... Last reply: Tristan Roberts, Jul 24, 2010, 12:38 am |
|
Licensed Professional Exemption (LPE) pathEBOM-2009 SSc5: Site development - protect or restore open habitatposted by Jutta Berns on Jul 14, 2010, 9:01 am
i just need to test my understanding: the LPE path, which is available for this credit, means that all we would need to do is ensure that the landscape architect, who has been involved in the... Last reply: Tristan Roberts, Jul 24, 2010, 1:26 am |
|
PRM baseline VS proposed building documentationNC-2009 EAc1: Optimize Energy Performanceposted by Tarek Dalati on Jul 13, 2010, 2:52 am
we are doing energy modeling for a mixed used tower (residential 30 flrs and office 6 floors and 5 floors parking under ground) can any one help in determining the following: Last reply: Christopher Schaffner, Jul 24, 2010, 6:58 am |
|
IEQ c5 requirement removedGeneral forumsposted by Allison Beer McKenzie on Jul 24, 2010, 9:03 am
It looks like the requirement for hazardous liquid waste containment for IEQc5: Indoor Chemical and Pollutant Source Control has been removed, which is probably for the better since the... |