Strategy for Reducing EUI on Projects: the Middle 70%
posted by Andrée Iffrig on
Friends, I reviewed the firm's 2019 AIA 2030 data with a Principal, having organized the data in such a way that we could manipulate it.
FTE calculation for 24/7 facility
NC-2009 PIf3:Occupant and Usage Dataposted by Kyle Strock on
We have a detention center intake facility which operates 24/7. Monday thru Friday there are 16 employees per 8 hour shift. On weekends there are 14 employees per 8 hour shift
Shift to Normal Credit
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by JLL Sustainability Consulting on
Hi All - What are thoughts on making this pilot credit an "OPTION 2" to the Quality Views credit? My project team believes that the regular Quality Views credit should allow for 2 points total.
Alternative Energy Performance Metric for Swedish project
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Pia Öhrling on
We are trying to pursue this credit since it better reflects our building performance than the cost-metric and it also gives us more Points.
Should Buildable Land Area include Playing Fields for University Campuses?
NC-v4 LTc4:Surrounding density and diverse usesposted by Ransom Burgess on
I am documenting surrounding density for a University Project, and am hoping to exclude playing fields from the buildable land area.
LTc7 in a campus project
NC-v4 LTc7:Reduced parking footprintposted by Instra Ingenieros on
Hi all, We are working on a building that will be in a master site previously LEED certified under a campus appoach.
How should visitor data be entered in the calculator?
NC-v4 WEp2:Indoor water use reductionposted by Kavita Suresh on
When entering visitor data in the calculator - should this represent visitors per day or in a year?
Substituting in EAc4 v4.1 on a v4 Project - Category Points Available
CI-v4.1 EAc4:Renewable Energyposted by Tim Bush on
I have a v4 project which is looking at substituting in the v4.1 version of EAc4 Renwable Energy Production.
Standby Cooling
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lara Cogill on
I am working on a large project for which the cooling is predominantly from central chillers providing chilled water. This complies easily with the requirements of EAc4.
Roof insulation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Neetika Parmar on
the credits requires all materials within the building interior (i.e within the waterproofing membrame) comply with low emitting criteria, however under insulation it says all thermal insulation (e