Topic | Recent |
---|---|
Parking Generation Manual, 5th EditionNC-v4.1 LTc7: Reduced parking footprintposted by Renee Azerbegi on Oct 24, 2019, 2:58 pminterim CEO (Peter Templeton) and other organization leaders and there appears to be a significant culture shift with clear action aleady happening and they are listening. There is even a LEEDuser forum... Last reply: Shawn Hogan, Jun 18, 2024, 3:23 pm |
|
Green Power & Carbon Offsets with SolarNC-v4 EAc7: Green power and carbon offsetsposted by Gareth Boys on Jun 16, 2024, 7:35 pm
Hi, I am assisting with the certification of a shop expansion project that will have a solar system that generates at least 50% of the required energy to run the new addition (I do not... Last reply: Marcus Sheffer, Jun 17, 2024, 4:24 pm |
|
Quality Views- Objects 25 FeetNC-v4.1 EQc8: Quality Viewsposted by Alexandre Penegre on Jun 17, 2024, 2:16 pm
Does every "object" outside of 25 feet count? The "quality" views would be facing a parking lot and then there are the backs of retail buildings 300 feet away. Do these reatil buildings count as... |
|
Pilot Credit – Local Food ProductionEBOM-v4 INc1: Innovationposted by Amanda Tullos on May 30, 2024, 1:32 pm
We are trying to pursue Pilot Credit – Local Food Production, but we are not sure how the Site-specific... Last reply: Jesse Hunt, Jun 17, 2024, 11:28 am |
|
Multiple Buildings in One Energy SimulationNC-2009 EAp2: Minimum Energy Performanceposted by PAWAN DAHIWAL on Apr 11, 2018, 6:40 am
Hi, Group Approach: There are 3 owner occupied buildings (same type) within LEED boundary serve by the common (central) HVAC system. Energy modelling software is capable... Last reply: Manuel Romera Molina, Jun 17, 2024, 10:54 am |
|
Building Product Disclosure and Optimization required documentationNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Marcelo Alencar Pereira on Mar 15, 2024, 10:49 am
Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If not... Last reply: Marcelo Alencar Pereira, Jun 17, 2024, 10:38 am |
|
Hotel Composting ProgramPilot-Credits SSpc129: Comprehensive Compostingposted by Belén Valladares López on Jun 17, 2024, 5:20 am
We are going to implement a composting program in a hotel. For this purpose, we will allocate adequate space to store organic waste that will be removed twice a week, according to the... |
|
Unregulated Loads- Contribution to % Improvement in Energy PerformanceCS-v4 EAc2: Optimize Energy Performanceposted by Clifford Poyton on Jun 7, 2024, 12:07 pm
For a manufacturing facility where unregulated loads exceed 50% of total energy, can energy efficiency improvements to unregulated manufacturing loads contribute to achieving a greater percentage... Last reply: Marcus Sheffer, Jun 14, 2024, 9:46 am |
|
Defintion of the term "Legal Wood"Pilot-Credits MRpc102: Legal Woodposted by Andres Schwarz on Apr 17, 2016, 10:40 am
Is there a simple way to reach a definition of "Legal Wood"? I have looked up in... Last reply: Crosier Kilgour, Jun 13, 2024, 3:24 pm |
|
Comments stricter than credit languagePilot-Credits EQpc57: Enhanced acoustical performance - exterior noise controlposted by Simon Joubert on Apr 21, 2020, 11:22 pm
Hi, We have a greenfield industrial building in the middle of an industrial zone in China. No residential buildings in the vicinity. After a first submittal we received a comment asking... Last reply: Emily Larochelle, Jun 13, 2024, 3:26 pm |