Topic | Recent |
---|---|
Are jet bridges inside or outside the building envelope?NC-v4.1 EQc2: Low-emitting materialsposted by Theresa Lehman on Jun 17, 2024, 6:27 pm
I am working on an airport project. Are jet bridges (Division 11), considered to be inside or outside the building envelope? Last reply: Deborah Lucking, Jun 21, 2024, 11:09 am |
|
Pilot Credit INpc155Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Controlposted by Roxanne Button on Jul 12, 2021, 4:13 pm
Has anyone attempted this Pilot Credit yet? Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requirements... Last reply: Michelle Halle Stern, Jun 21, 2024, 10:53 am |
|
Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?CS-v4 LTc6: Bicycle facilitiesposted by Nadia Garcia on Apr 18, 2024, 3:59 pm
Hello LEED community, I'm seeking clarification regarding the Bicycle Facilities credit requirements in LEED v4 BD+C: Core & Shell, specifically regarding the inclusion of shower... Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:42 am |
|
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarNC-v4 WEc1: Outdoor water use reductionposted by Nandan Tavkar on Jun 19, 2024, 5:39 am
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:40 am |
|
LEED PC 66 Community Contaminant PreventionPilot-Credits EApc66: Community contaminant prevention - airborne releasesposted by Amanda Brathwaite on Apr 16, 2015, 4:55 pm
There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that... Last reply: Michelle Halle Stern, Jun 21, 2024, 10:34 am |
|
Recycled Content Report (Post-Consumer & PreConsumer)NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Mu'ath Ad on Jun 7, 2024, 2:02 pm
Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons. ... Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:34 am |
|
Core and Shell OfficePilot-Credits SSpc129: Comprehensive Compostingposted by Michelle Rosenberger on Jun 20, 2024, 3:18 pm
Signage, receptacles and outreach education are very different with a core and shell building with no internal tenants or project management in place. Since composting is mandated in our city and... |
|
Low Mercury LampsNC-2009 IDc1: Innovation in Designposted by Michelle Rosenberger on May 18, 2017, 2:56 pm
It has always been my understanding, underscored by the LEEDuser LEED... Last reply: Justin Southwick, Jun 19, 2024, 5:43 pm |
|
Snow MeltEBOM-2009 SSc2: Building Exterior and Hardscape Management Planposted by Elizabeth Felder on Jul 29, 2014, 9:37 am
We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown. Is it assumed that this product is non-... Last reply: Kristina K, Jun 19, 2024, 4:27 pm |
|
Kitchen exhaust in Multifamily buildingsNC-v4 EQp1: Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on Apr 11, 2023, 12:08 pm
Hi everyone, Last reply: Camilo Velez, Jun 19, 2024, 9:02 am |