Forum quick links
Is utilizing aerobic processor equipment an acceptable strategy for this credit?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Annalise Dum on
Our project is considering utilizing kitchen equipment that uses aerobic processing to break down food waste into liquid that is then discharged via the plumbing onsite.
No Cooling Tower in LEED v2009 School
Pilot-Credits WEpc94:No Cooling Towerposted by Sandra Schmid on
We are working on a LEED v2009 school project in Germany which is equipped with VRV refrigerating outdoor units for cooling of some rooms so there is no cooling tower, no use of latent heat of the
Residential Exhaust (toilet and kitchen)
NC-v4 EAp2:Minimum energy performanceposted by Michelle Christopher on
Hello, I'm trying to get some cliarity regarding residential zone exhaust (from toilet exhaust and kitchen exhaust).
Minimum Area Requires for Garden Space
CS-v4 SSc3:Open spaceposted by Dean Barone on
The reference guide does not provide any information about the sizes for the community gardens for urban food production. Is there a minimum amount of space dedicated to growing food tha
Inclusions in LCA model
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Dalia Abdalla on
Hello,
Distancing or Not?
posted by Luke Leung on
Help regarding below...
OSHA, see below link, suggests 6' social distancing for unvaccinated or at-risk workers.
Fire station water usage?
NC-v4 WEp2:Indoor water use reductionposted by Erin Holdenried on
Looking for advice on how to treat fire station water usage. If the occupants will be at the fire station for a 24 hour period, does that put them in the category of residents, as oppose
Standard reference for Canadian projects
Pilot-Credits SSpc55:Bird collision deterrenceposted by Josée Lupien on
Hello,
I would like to know if the new CSA A460:19 Bird-Friendly Building Design can be used for canadian project to acheive this pilot credit?
How to identify nonattainment areas for projects outside of the US/Canada?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Guillaume FABRE on
Hi all, I am pretty clear about the definition of nonattainment area given in ASHRAE 62. This being said, how to identify nonattainment areas for projects outside of the US/Canada?
MR Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Gail Vittori on
Credit was straightforward. In our market, there is only one CORR-certified provider. Curious if that's the case in other markets.