Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Zones for a small CI 2.0 Project

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Greg Hackett  on 

We have an office project (LEED CI 2.0) in an exsitng small building about 3500 s.f. The building is served by one existing central system that provides OA to the space.

3
Default Avatar
RA, LEED AP BD+C
ATA/Beilharz Architects
LEEDuser Basic Member
37 thumbs up
Tue Apr 5, 2011, 12:32 am
3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 4, 2011, 8:56 pm

Renovation versus Demolition

NC-2009 IDc1:Innovation in Design
posted by  sara frye  on 

After much research and discussion it was decided to renovate an extremely decrepit farmhouse, portions of which date back to the 18th century.

3
Mon Apr 4, 2011, 7:36 pm

registration

General forums
posted by  Esmeralda Ward  on 

Hello, I received an email about this webcast and am interested, however there is no link to register. Is this only open to upgraded membership holders? thanks.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 4, 2011, 6:08 pm
2
Project Manager
Johnson Braund,Inc
LEEDuser Basic Member
3 thumbs up
Mon Apr 4, 2011, 1:00 pm

Option 2: Floor Area Clarification

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shannon Terrell  on 

If my bay depth to core is deeper than 2 times the height of the window, is the area beyond 2H still part of the floor area calculation?

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Fri Apr 1, 2011, 10:09 pm
3
Default Avatar
LEEDuser Basic Member
107 thumbs up
Fri Apr 1, 2011, 8:15 pm

Flowing water Pressure for Kitchen Sink

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Yong Lee Low  on 

My project is a commercial building. All the fittings except Kitchen sink have been finalized.

2
Default Avatar
VP GM Commercial Business Unit
American Standard Brands
LEEDuser Basic Member
16 thumbs up
Fri Apr 1, 2011, 12:35 pm
4
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Fri Apr 1, 2011, 3:33 am

Error Message when trying to select Complete

EBOM-2009 WEc1:Water Performance Measurement
posted by  Cynthia Fowler  on 

I get the following message when I try to click "Complete" for the credit: "...Form shows that documentation requirements have not been met..." I checked and rechecked and verified that all the doc

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Fri Apr 1, 2011, 2:54 am