CI-2009 EAp2:Minimum Energy Performanceposted by Monika Mickute on
We recently purchased a 7,000 SF, 1-story office building for our own use. We are attempting LEED CI Platinum but are not touching the exterior walls or roof.
ACP
posted by Angela Saggin on
Hi! I haven't seen if someone has already asked this, so if someone has done it, I'm sorry to be questioning again. When we choose the alternative compliance, it's also needed to complete the ori
Is there a time limit to submit for final final review
posted by Steve Khouw on
We have a project already passed the Design Phase review almost one year ago then the project was suspended during construction by the Owner for their internal reasons and recently restarted again
Self-Declared compliance
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Alison Y Rivenburgh on
Has anyone had any luck submitting materials that are "self-declared" compliant from the manufacturer?
Zone air distribution ventilation effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maria Kutelova on
I need help with determining proper case for the Air Distribution Configuration per table per Table 6-2. The forth entry required a velocity of 150 cfm to be reached within 4.5 ft of floor levels.
AGMBC for a Campus Wide Study
posted by Mei Zhu on
We are doing a study on a university campus which has had a few LEED certified projects in the past.
Option 1 Path 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by shaun Andriano on
Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day.
Documenting VOC content in products
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Hi everybody... again. Does anybody know if manufacturers' letters are accepted as proper documents to proof VOC levels?
Unable to receive the Energy Star Rating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Dorilee Torres on
Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US.
EAp2/EAc1 Renovation Vs. New construction
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Beccia on
We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and building interior.