EAp2

CI-2009 EAp2:Minimum Energy Performance
posted by  Monika Mickute  on 

We recently purchased a 7,000 SF, 1-story office building for our own use. We are attempting LEED CI Platinum but are not touching the exterior walls or roof.

12
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 18, 2012, 9:16 pm

ACP

General forums
posted by  Angela Saggin  on 

Hi! I haven't seen if someone has already asked this, so if someone has done it, I'm sorry to be questioning again. When we choose the alternative compliance, it's also needed to complete the ori

2
Project Manager, LEED
USGBC
LEEDuser Premium Member
41 thumbs up
Wed Apr 18, 2012, 8:23 pm

Is there a time limit to submit for final final review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Steve Khouw  on 

We have a project already passed the Design Phase review almost one year ago then the project was suspended during construction by the Owner for their internal reasons and recently restarted again

3
Wed Apr 18, 2012, 5:16 pm

Self-Declared compliance

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Alison Y Rivenburgh  on 

Has anyone had any luck submitting materials that are "self-declared" compliant from the manufacturer?

3
Wed Apr 18, 2012, 4:09 pm

Zone air distribution ventilation effectiveness

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maria Kutelova  on 

I need help with determining proper case for the Air Distribution Configuration per table per Table 6-2. The forth entry required a velocity of 150 cfm to be reached within 4.5 ft of floor levels.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Apr 18, 2012, 1:40 pm

AGMBC for a Campus Wide Study

LEED Guidance for Campuses and Multiple Buildings
posted by  Mei Zhu  on 

We are doing a study on a university campus which has had a few LEED certified projects in the past.

2
LEED Project Reviewer certificate holder
LEEDuser Basic Member
76 thumbs up
Tue Apr 17, 2012, 7:19 pm

Option 1 Path 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  shaun Andriano  on 

Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day.

9
Tue Apr 17, 2012, 4:41 pm

Documenting VOC content in products

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Petra Hajná  on 

Hi everybody... again. Does anybody know if manufacturers' letters are accepted as proper documents to proof VOC levels?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 17, 2012, 4:32 pm

Unable to receive the Energy Star Rating

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Dorilee Torres  on 

Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US.

3
Tue Apr 17, 2012, 3:59 pm

EAp2/EAc1 Renovation Vs. New construction

NC-2009 EAp2:Minimum Energy Performance
posted by  Steven Beccia  on 

We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and building interior.

3
Default Avatar
Mechanical Engineer
Clark Nexsen
LEEDuser Basic Member
4 thumbs up
Tue Apr 17, 2012, 1:28 pm