Submitting "Design" and "Construction Phase together
posted by Prashant Kulkarni on
Please advise how we could submit "Design" and "Construction" Phase submittals together based on the following situation: 1.
documenting uneven male/female occupancy
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marni J Evans on
Hello All, Can you please provide your insight?
Residential Kitchen Sink / Kitchen Sink / Public Lavatory Faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Udana Ratnayake on
We are working in a hotel project where no kitchen sinks have been installed in guest rooms. guests come to restaurants within hotel premises to take meals.
Uploading Zip files?
posted by Diana Nezamutinova on
Would it be acceptable to upload zip files that contain more than one document in it? Or is it preferable to upload documents one by one in Pdf, Excel, AutoCad, etc.?
Outdoor Airflow Measurement with constant volume ventillation
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Michael Smithing on
Our building measures the outdoor airflow at the AHU. As we have a constant volume system (fan-coils) with 100% fresh air, from that point onward the airflow is not varied.
Changing CxA agents after Final Design
NC-2009 EAc3:Enhanced Commissioningposted by Elle Brown on
Due to issues with the contract and how our project was funded, we may be forced to get a new CxA to continue the project after final design.
Which area type should be considered for simulation?
CS-2009 EAc1:Optimize Energy Performanceposted by Fabiano Castro on
A question has been raised regarding which space area (GROSS or NET) should be considered into the simulation thermal blocks conception in order to result in the most accurate results.
Low VOC content for treated wood products
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Matthew Perna on
Are preservative-treated and fire-treated wood products exempt from this credit since the treatment is done off-site?