Timeline to join for project teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Christoph Weindl on Sep 25, 2020, 11:27 am
We're pursuing "Social equity within the project team" with Option 2. Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years... Last reply: , Jul 15, 2024, 5:59 pm |
|
Ventilation Requirements for Sporadically Used SpacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Santiago Avila on Sep 6, 2023, 7:24 am
Hello everyone, I have a question regarding which areas should be ventilated. In our project, a residential building, we have spaces on the ground floor designated for flexible work areas... Last reply: Afogreen Build, Jul 15, 2024, 9:56 pm |
|
RECs in EBOM 4.1EBOM-v4.1 EAp3: Energy Performanceposted by Christian Garcia on Apr 18, 2024, 10:50 am
I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago. Does anyone know... Last reply: Alexis Voeltner, Jul 16, 2024, 1:27 pm |
|
Hard-lid ceiling with access panelNC-v4 EQc1: Enhanced indoor air quality strategiesposted by on Jul 16, 2024, 2:42 pm
For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling? Deck to deck partitions aren't feasible for the janitor's... |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by on Jan 5, 2023, 10:45 am
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits. Analyzing a combination of EPDs, HPDs, and Safety Data Sheets for the products installed allowed the team... Last reply: Gabrielle Gambino Lyon, Jul 17, 2024, 12:14 pm |
|
Joint Compound and Joint Tape- GREENGUARD Gold requirementsNC-v4.1 EQc2: Low-emitting materialsposted by Jason Biondi on Jul 29, 2019, 3:08 am
Here is the technical advice we receive for one of the project: "Provide general emissions evaluation results for ProForm All Purpose Joint Compound and Joint Tape. The documentation for... Last reply: Edgar Arevalo, Jul 17, 2024, 1:50 pm |
|
Sample testing required?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by on Sep 19, 2023, 12:48 pm
Hello everyone, Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or... Last reply: Kari Botek, Jul 17, 2024, 1:56 pm |
|
Modeling energy savings from receptacle load within energy simulationCI-v4 EAc2: Optimize Energy Performanceposted by Martina Dell'antonio on Jul 4, 2024, 10:23 am
Hi, while reading the ID+C guideline (EAp2, p.140) I see that:"Some efficiency measures that no longer need to be modeled using an exceptional calculation method include low-flow water... Last reply: Marcus Sheffer, Jul 17, 2024, 3:53 pm |
|
EPD Option 2: OptimizationNC-v4.1 MRc2: Environmental Product Declarationsposted by Laura Ribeiro on Jul 17, 2024, 3:30 pm
Hello everyone, I am using some products that already have 2 versions of EPDs, and in the new version there is a table with the differences in relation to the previous EPD. Does... |
|
Regarding no refrigerant optionNC-v4 EAc6: Enhanced Refrigerant Managementposted by Nagaraj Sankar on Nov 1, 2023, 11:11 am
The project having spaces without cooling systems.In this case can we purchase no refrigerant option to achieve this credit. Last reply: Afogreen Build, Jul 17, 2024, 9:29 pm |