Topic | Recent |
---|---|
Methodology for calculating a (7) Seven Day A Week SurveyEBOM-2009 SSc4: Alternative Commuting Transportationposted by Reynaldo Castro on Apr 13, 2010, 8:56 pm
Hello we are a Convention Center open seven days a week. The instructions given for the survey are for a 5 day week scenario. How do you figure for a seven day a week scenario. Last reply: Matthew Macko, May 20, 2010, 1:43 pm |
|
Stream Channel Protection? (case 1, option 2)NC-2009 SSc6.1: Stormwater design - quantity controlposted by Joshua Radoff on Apr 30, 2010, 1:13 pm
Has anyone out there had any success using the Stream Channel Protection option (Option 2 for CASE 1) where the existing impervious is less than 50%? I've got an urban project (in Denver... Last reply: Gregory Hurst, May 20, 2010, 1:01 pm |
|
clarifyEBOM-2009 SSc4: Alternative Commuting Transportationposted by Jonathan Weiss on Feb 9, 2010, 12:26 pm
I think what Robert is asking is whether LEED means "to and from the building once a day" (round trip), or "to and from the building twice a day" which means two round trips. I would... Last reply: Jenny Carney, May 20, 2010, 12:23 pm |
|
ASTM E 1980NC-2009 SSc7.2: Heat island effect - roofposted by gustavo goldman on May 17, 2010, 5:14 pm
We have a surfaces that we need to get... Last reply: Tristan Roberts, May 20, 2010, 2:55 am |
|
Just the Plan?NC-2009 EAc5: Measurement and Verificationposted by Jean Marais on May 19, 2010, 6:11 am
I've just checked the LEEDonline submittal form for this credit (which by the way mentions a previously unknown EAp2: Minimize Energy Performance prerequisite, ha, ha) which has the following... Last reply: Tristan Roberts, May 20, 2010, 2:15 am |
|
Can you "double-dip" with Open Space and Habitat?NC-2009 SSc5.1: Site development - protect or restore habitatposted by April Ambrose on May 18, 2010, 6:34 pm
I never thought that you could use the same land and attribute it to both open space and habitat, but maybe you can. In the "Related Credits" section of the reference guide, the Habitat credit... Last reply: Tristan Roberts, May 19, 2010, 10:24 pm |
|
EAc2.1- ASHRAE RouteEBOM-2009 EAc2.1: Existing building commissioning - investigation and analysisposted by Miriam Gee on May 19, 2010, 7:19 pm
Hi LEED users.... wondering if our... Last reply: Jenny Carney, May 19, 2010, 7:23 pm |
|
LEED only requires a Contract to be inplace for 10 Month ReviewNC-2009 EAc3: Enhanced Commissioningposted by Jean Marais on May 19, 2010, 4:14 am
The way I read this is that LEED only requires a contract to be in place for the 10 Month Review. The contract must include in its scope: 1) One 10 Month Review Plan which will incorporate... |
|
1/4 radius vs walking distanceNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Annette Bellafiore on May 18, 2010, 6:59 pm
The language seems a little confusing whether the bus stops need to be within 1/4 mile... Last reply: Dave Intner, May 18, 2010, 8:17 pm |
|
Looks acceptableGeneral forumsposted by David Posada on May 18, 2010, 12:13 pm
You'll want to give the MPR Supplemental Guidance document a close read, especially for MPR's #2 and #3, but nothing in your situation appears to preclude you from registering this as one LEED... Last reply: Tristan Roberts, May 18, 2010, 12:22 pm |