Topic | Recent |
---|---|
Patient RoomsPilot-Credits WEpc147: All-Gender Restroomsposted by Vanessa Hostick on Aug 14, 2023, 12:23 pm
Does anyone have experience documenting this pilot credit on a hospital? It's unclear if the patient room should be included or excluded from the documentation and count. Each of our patient... |
|
FurnitureNC-v4 MRp2: Construction and demolition waste management planningposted by Alexandra Kravel on Aug 14, 2023, 12:26 pm
We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing... |
|
FurnitureNC-v4 MRc5: Construction and demolition waste managementposted by Alexandra Kravel on Aug 14, 2023, 12:28 pm
We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing... |
|
LEED Certification for an Existing BuildingLEED v4.1 Discussion Forumposted by Mary Christel Eugenio on Aug 15, 2023, 7:57 am
Hi, |
|
Lighting Control- Recording StudioCI-v4 EQc6: Interior lightingposted by Edgar Arevalo on Aug 15, 2023, 2:41 pm
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After checking this... |
|
Interior element reuse in different projectCI-v4 MRc2: Interiors life-cycle impact reductionposted by Nadia Azzam on Aug 16, 2023, 1:33 pm
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED). In this case, can the first project claim points under LEED's... |
|
Seed Evaluator Tool Effectiveness?Pilot-Credits IPpc89: Social equity within the communityposted by Charles Boechler on Aug 16, 2023, 3:20 pm
Is the Seed Evaluator the best tool for measuring social equity? A challenge for us in addressing social equity in plan development is engagement of the existing community is often not... |
|
Relevant Trades/Contractors at Project Planning StagePilot-Credits IPpc81: Green training for contractors, trades, operators and service workersposted by Charles Boechler on Aug 16, 2023, 3:27 pm
From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key... |
|
Downstream Implementation of Analysis OutcomesPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Charles Boechler on Aug 16, 2023, 3:34 pm
This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance. I am curious how value engineering exercise at the construction stage has... |
|
Additional Source Control and Monitoring; sensor locationsNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Chris Flint Chatto on Aug 16, 2023, 4:33 pm
Wondering what this credit requires for location of... |