v4.1 Schools Option 1 Path 2 Connected Site as an Alternative Compliance path in v4 BD&C New ConstructionNC-v4.1 LTc4: Surrounding density and diverse usesposted by Jerimiah Luckett on Aug 15, 2022, 4:16 pm
Project is a City Transportation (Bus) Maintenance Facility, location is on the backside of an industrial area abutting a shipping/industrial railyard to the south and warehouses, industrial... |
|
Small Storm Hydrology Method- Run off volume Question on metricsNC-v4 SSc4: Rainwater managementposted by Stephan Zweig on Mar 2, 2023, 2:11 pm
Hello to all Users, I have following question: The run off Volume calculation method : V=P*Rv*A/12 as given in the reference guide does it refer to Run off volume per month... |
|
Option 2 and / or Option 3Retail-CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Ian McCall on Mar 3, 2023, 4:27 pm
Dear LEED Experts, I woud like to use Option 3 and Option 2 to achieve the maximum number of point and even an Exemplary level point. It is possible to combine "Option 2 and... |
|
New Construction project with warehouse and bus parkingNC-v4 LTc8: Green vehiclesposted by Dina El-Sady on Mar 5, 2023, 6:14 am
The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building... |
|
Is Option 2 AND Option 3 possible?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Ian McCall on Mar 6, 2023, 2:50 am
Dear LEED Experts, In v4.1 is possible to combine "Option 2 AND Option 3" together or is just limited to "Option 1 AND/OR Option 2 OR ... |
|
Warehouse Ventilation- FiltrationWarehouses-NC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Ioanna Margariti on Mar 6, 2023, 5:43 am
Hello all, In a project of ours, we have a warehouse with office spaces. According to the Reference Guide, the warehouse area is considered a regularly occupied space that requires fresh... |
|
Vegetation above underground rainwater harvesting tankData-Centers-NC-v4.1 SSc2: Protect or Restore Habitatposted by Y Nguyen on Mar 7, 2023, 5:48 am
Hi all, My question is regarding a landscape area calculation for Data center project. Currently design, the landscape area is including around 11% vegetation area above... |
|
INpc138 Safety First Pilot Credit TransitionPilot-Credits INpc138: Managing Indoor Air Quality for Infection Controlposted by Barry Abramson on Mar 8, 2023, 6:01 am
We have pursued this pilot credit several times for client buildings. It was extremely relevant during the height of the pandemic but has ongoing importance. Very pleased that USGBC has... |
|
Toilet stalls within locker roomsPilot-Credits WEpc147: All-Gender Restroomsposted by Zeynep Cakir on Mar 9, 2023, 9:04 am
Hello everyone, We have a multifamily residential building and on the ground floor there is a recreational area with sports facilities. I'd like to learn if we can exempt the toilet stalls... |
|
LEED O+M Campus Chiller PlantEBOM-v4.1 EAp3: Energy Performanceposted by Rajarajan Sekar on Mar 11, 2023, 1:47 am