Forum quick links
Vegetated areas
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Patricia Missawa on
I’m having some doubts on how to define the stormwater volume treated by different types of vegetated areas since in Brazil we don’t have any study related to it. 1- If my project has a flat vegeta
For EBOM, do we do a threat rating assessment?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Lee Ann Walling, LEED AP ND on
We are a state natural resources agency with lots of bird strikes, so we would like to pursue this credit as part of our LEED EB: O&M project.
How many times can the appeal be submitted?
posted by dia2000@gmail.com dia2000@gmail.com on
As of my understanding, appeals can be submitted as many times as the project team wishes.
Performance Period
Pilot-Credits SSpc55:Bird collision deterrenceposted by Sarah Brophy on
I see from the EBOM flow-chart that there is a performance period of three years in addition facade monitoring plan establishment. Am I interpreting this correctly?
Geothermal (Sometimes you're in, sometimes you're out!)
CS-2009 EAc2:On-site Renewable Energyposted by Katie Mesia on
We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation.
Efficiencies for System 4 – PSZ-HP (packed roof top heat pump)
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
According to Table G3.1.1A for the baseline model I have to model System 4 – PSZ-HP (packed roof top heat pump). I’m wondering what efficiencies I have to consider.
Thermal comfort for fitness center
NC-2009 IEQc7.1:Thermal Comfort—Designposted by HOUCINE TLEMSANI on
I am working on a fitness center where the temperature is maintained low and the air velocities adequate thru the use of fans. The ASHRAE tool show that the people that are working out and have a
Automatic vs Manual shades
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mike Decoster on
We are working on a LEED 2009 NC project and looking at the daylighting.
Calculating FTE
posted by Adriana Salles on
Hello! We are pursuing LEED NC 2009. Our project is a Data center office building which will be operated 24 hours, 365 days per year, with No transients, visitors or residents in the building.
ashrae 90.1 2007 - space type
CI-2009 EAp2:Minimum Energy Performanceposted by gustavo goldman on
The selling area of a retail commercial interior project will be a conditioned space located over a parking area whose height is half under sidewalk level and half above it.