Forum quick links
Durability Evalution links don't work
posted by Jennifer Berthelot-Jelovic on
Does anyone have a good site for determing average annual wind and rainfall? The links from our durability evaluation form isn't working.
GREENGUARD certified
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by SIG - Sustainability Main Account on
Does GREENGUARD certified furniture count as a sustainable criteria?
EA Cr 1.3 and District Thermal Energy
CI-2009 EAp2:Minimum Energy Performanceposted by M.S. Chan on
In the 8/13/10 document for Treatment of District or Campus Thermal Energy in LEED V2 & 2009, Appendix A says that District Energy Systems have no effect on any EA section prerequisites or cred
Using Heat Pump for Domestic Water Heating
CI-2009 EAp2:Minimum Energy Performanceposted by M.S. Chan on
We are using heat pumps for domestic water heating. (The water source will be from the campus/district condenser water system.) Can we take credit in the energy calculations using heat pumps?
Public Comment responses
posted by Bill Swanson on
I don't see responses to the 4th Draft. Anyone know where to find them?
international project outside US
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sofia Otterheim on
Hi all we are doing a international project outside US. when we started to prepare for this credit we used the energy star portfolio to get a rating for project building.
Office Building + warehouse + Production Floor
NC-2009 EAp2:Minimum Energy Performanceposted by Jackson . on
Hi all, We have a project back in climate zone 1 and in the struggling to understand energy modeling for such building combination.
Buildings Connected by Maintenance Tunnel
posted by Dave Wortman on
I am working on a project where two buildings directly adjacent to each other but separated by 10-20 feet are being designed to be connected by an underground tunnel.
Densely occupied spaces exemption
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Katherine Ann Resurreccion on
Hi All, We have a project that has a lot of meeting rooms (area of each room is smaller than 150 square feet) that can accomodate 4 person per meeting room - therefore considered densely occupied
ENERGY COST BUDGET METHOD, ENVELOPE
CI-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Greetings. I am working on a Commercial interior project pursuing the EAP2, and I chose the section 11 as an alternative to prescriptive approach, but, i am a little bit confused about how to sim