CxA Appointment

NC-2009 EAc3:Enhanced Commissioning
posted by  Ameet AA  on 

Project type: School Academy LEED Rating: New Construction 2009 for School, AGMBC 2010 Approach Hi my company is providing LEED Assessment, Architectural as well as MEP consultancy to School Pro

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Nov 5, 2012, 5:09 pm

Accounting for Sun Shades in the Prescriptive Method

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Dan Bielenin  on 

When calculating the amount of daylight (via the prescriptive method) that enters through a south-facing window that utilizes sun shades, how does one account for the added shading benefit in order

3
Default Avatar
William Rawn Associates
LEEDuser Basic Member
0 thumbs up
Mon Nov 5, 2012, 5:05 pm

Server Room Submetering

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Patrick Culhane  on 

I'm inquiring in regards to server room spaces within an office building up for LEED EBOM. We have a portion of our server rooms that are submetered and a portion that are not.

2
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Sun Nov 4, 2012, 3:40 pm

LPD - SI vs IP

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcus Sheffer  on 

My turn - a question for those of you who have the SI version of 90.1. Is the lighting power density identical in both versions?

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Nov 3, 2012, 9:50 pm

Fan power in Proposed Model

CS-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

Hello, I'm working in a C&S project where I have a partial desing of Air conditioned. The owner will give cold water and outdoor air in each tenant space.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Nov 2, 2012, 4:23 pm

Letters to Material Suppliers & others

LEED for Homes (LEED-H) Forum
posted by  Donald Morrill  on 

Dear Tristan, We are building a three story multi family structure, that we are working wiht a LEED provider, Davis Energy Group to achieve a PLeLEED Platinum rating.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Nov 2, 2012, 4:11 pm

Updating the LEEDOnline form after being accepted

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, If the USGBC awards 4 points under EA Credit 1, but then the design team decides to add significant lighting to the project which will increase the Proposed consumption (and consequently

7
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Nov 2, 2012, 1:33 pm

Does PPR piping need insulation?

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

We have run into a situation with piping material used in a hotwater distribution system. Our client is using Polypropelene piping.

3
Building Performance Engineer
SSRCx
LEEDuser Basic Member
5 thumbs up
Thu Nov 1, 2012, 9:48 pm

Irrigation during drought conditions

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lauren Ford  on 

Our project has limited turf areas that will require irrigation. We have a small irrigation system supplied by a rainwater cistern sized to provide required volume per LEED requirements.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Thu Nov 1, 2012, 5:32 pm

Cistern Capacity

posted by  Adolfo Silva  on 
3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Nov 1, 2012, 2:30 pm