Forum quick links
Single Stream Waste / Recycling
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Terry Gorski on
What would be the best way for a building to document their audit if they contract for single stream waste/recycling?
Group Certification Fees
posted by Omer Moltay on
I can see that group certification (AGMBC Part II) is now available.
LEED Excel spreadsheet protected?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Sara Goenner Curlee on
I'm trying to update the LEED daylight spreadsheet but it seems to be protected.
EQUIPMENT CAPACITY OVERSIZING
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
I AM BEGINEER IN THIS FIELD.
building dashboard
Schools-2009 IDc1:Innovation in Designposted by Eri Spaulding on
We are installing a building dashboard at the School's main entrance Lobby which will display energy consumption in real-time and compare with a baseline.
100% open space regulation
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Simon Chantal on
What happens when the local code states that 100% of undevelopped space must be covered with grass or plants?
IEQp1- A3 Table Mechanical Ventilation 100%OA
NC-2009 IEQp1:Minimum IAQ Performanceposted by Todor Boyadzhiev on
Hello All, I have noticed the following while filling in this table: There is NO fieled where one can fill in the Project Design Outdoor Airflow for EACH SEPARATE ROOM.
Pilot Credit 42: Integrated Process
NC-2009 IDc1:Innovation in Designposted by AshLee Eustace on
My project had been planning on registering for Pilot Credit 42: Integrated Process, but it appears that this is pilot credit is no longer an option.
Changing compliance path after preliminary review
posted by Matthew Merli on
We just received our comments back for our first (preliminary) construction review.