How Calculate Raw Material Distance for New Option 2
NC-2009 MRc5:Regional Materialsposted by Charles Clark Jr on
The new Option 2 of MRc5 which was deemed to be applicable in the July 6, 2012 Addendum qualifies products and the raw materials used to make them based on the actual distance of the route they tra
Do we need to apply in an off-site mode?
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by yan lian on
Our leed project is a single building with other 4 buildings surrounding it.
Where to Input Average Occupancy Level on Form?
EBOM-2009 IOc3:Documenting sustainable building cost impactsposted by Terry Gorski on
We received the following comment back from the preliminary review on a project: “The average occupancy level (the percentage of the total floor area fully occupied) of the building must be include
ASHRAE Standard vs ANSI Standard
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ema S on
Do we need to comply with either the ASHRAE Standard vs the ANSI Standard to meet the Prerequisite???? And if so, who is usually the party responsible for documenting the compliance.....it seems th
Combination Campus / On-site approach?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Cara Sloat on
I'm working on a Canadian, CAGBC LEED NC 2009 project that is located with a business park.
Total builtup area calculation for Developemnt density
CS-2009 SSc2:Development Density and Community Connectivityposted by Lavanya Veerappa on
Should the total built up area consider the basemet area as well ?
Submetering of each ECM
NC-2009 EAc5:Measurement and Verificationposted by Jatuwat Varodompun on
Can the submeters for optionD are only provided to cover all ECMs. For instance, if we aim to measure the pump energy, the submetering for the pumps will be provided.
IEQc7.1_Thermal Comfort Design Narrative
NC-2009 IEQc7.1:Thermal Comfort—Designposted by susan eguia on
Hi, We have a library project and we received the review comments from USGBC and requested to provide the following: 1.
Subway stations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Valentin Grimaud on
Hello everyone, we are looking at the feasibility of doing LEED for subway stations.
FTE
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Kasandra Martin on
How do I know what my FTE is? I am guessing it is what I am told the occupancy will be. I am working on a LEED CI, existing building with new addition.