Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How Calculate Raw Material Distance for New Option 2

NC-2009 MRc5:Regional Materials
posted by  Charles Clark Jr  on 

The new Option 2 of MRc5 which was deemed to be applicable in the July 6, 2012 Addendum qualifies products and the raw materials used to make them based on the actual distance of the route they tra

3
Fri Dec 14, 2012, 5:30 pm

Do we need to apply in an off-site mode?

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  yan lian  on 

Our leed project is a single building with other 4 buildings surrounding it.

3
Default Avatar
green building consultant
Schneider Electric (China) Co.,Ltd.
LEEDuser Basic Member
1 thumbs up
Fri Dec 14, 2012, 5:07 pm

Where to Input Average Occupancy Level on Form?

EBOM-2009 IOc3:Documenting sustainable building cost impacts
posted by  Terry Gorski  on 

We received the following comment back from the preliminary review on a project: “The average occupancy level (the percentage of the total floor area fully occupied) of the building must be include

2
Default Avatar
Sales and Marketing Executive Assistant
Sustainable Solutions Corporation
LEEDuser Basic Member
33 thumbs up
Fri Dec 14, 2012, 4:05 pm

ASHRAE Standard vs ANSI Standard

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Ema S  on 

Do we need to comply with either the ASHRAE Standard vs the ANSI Standard to meet the Prerequisite???? And if so, who is usually the party responsible for documenting the compliance.....it seems th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 14, 2012, 3:40 pm

Combination Campus / On-site approach?

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Cara Sloat  on 

I'm working on a Canadian, CAGBC LEED NC 2009 project that is located with a business park.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Dec 14, 2012, 9:26 am

Total builtup area calculation for Developemnt density

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Lavanya Veerappa  on 

Should the total built up area consider the basemet area as well ?

5
Ms
LEAD Consultancy & Engineering services
LEEDuser Basic Member
5 thumbs up
Fri Dec 14, 2012, 6:34 am

Submetering of each ECM

NC-2009 EAc5:Measurement and Verification
posted by  Jatuwat Varodompun  on 

Can the submeters for optionD are only provided to cover all ECMs. For instance, if we aim to measure the pump energy, the submetering for the pumps will be provided.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 13, 2012, 10:43 pm

IEQc7.1_Thermal Comfort Design Narrative

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  susan eguia  on 

Hi, We have a library project and we received the review comments from USGBC and requested to provide the following: 1.

5
Default Avatar
LEED Coordinator/Construction Administrator/Business Development
Building Solutions Group, Inc.
LEEDuser Basic Member
47 thumbs up
Thu Dec 13, 2012, 10:12 pm

Subway stations

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Valentin Grimaud  on 

Hello everyone, we are looking at the feasibility of doing LEED for subway stations.

3
Thu Dec 13, 2012, 10:02 pm

FTE

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Kasandra Martin  on 

How do I know what my FTE is? I am guessing it is what I am told the occupancy will be. I am working on a LEED CI, existing building with new addition.

10
Thu Dec 13, 2012, 5:50 pm