Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Submetering - Process Water

CI-2009 EAc3:Measurement and Verification
posted by  Michelle Rosenberger  on 

I can see in the threads some discussion about submeters and what really constitutes complying with Case 1 but I'm still confused.

4
Default Avatar
Designer, Sustainability Department
LEEDuser Basic Member
2 thumbs up
Wed Dec 19, 2012, 4:54 pm

Title 24 vs. ASHRAE as baseline

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Michelle Rosenberger  on 

I'm not sure where to post this EApr2 form but Lighting Power Density question. I see there has been some discussion about the issue of Title 24 vs.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Dec 19, 2012, 4:49 pm

Convenience Store

LEED Rating System Selection
posted by  Omer Kalafatoglu  on 

Hello, One of my clients is planing get LEED certification for his convince store. This is an existing store.

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Dec 19, 2012, 2:03 am

Simple Tips on Defining a Project Boundary

General forums
posted by  virginia waik  on 

I am curious about the dos and don'ts of defining a project boundary for our whole bulding LEED NC v3 project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Dec 18, 2012, 9:13 pm

IEQc4.6 as ID point in LEED NC 2009

NC-2009 IDc1:Innovation in Design
posted by  Joseph Ford, AIA  on 

I would like to use IEQc4.6: Low-Emitting Ceiling & Wall Systems from NC-Schools as an ID point in my NC-not a school project.

4
Default Avatar
Architect
RSP Architects Ltd.
LEEDuser Basic Member
14 thumbs up
Tue Dec 18, 2012, 9:13 pm

LEED-ND Costs for large projects

ND-v2009 PIf1:Development Program and Site Type
posted by  Lauren Sparandara  on 

I am assisting on a project that is 8,000 acres. The LEED FAQ sheet suggests that projects greater than 320 acres certify under multiple submissions.

2
Manager, Neighborhood Development
U.S. Green Building Council
LEEDuser Premium Member
41 thumbs up
Tue Dec 18, 2012, 8:46 pm

Additionnal Interior Lighting Power

CI-2009 EAp2:Minimum Energy Performance
posted by  MATHIEU HOULE  on 

I'm working on a LEED-CI offices project.

3
Mon Dec 17, 2012, 8:40 pm

Space Classification

NC-2009 EAc1:Optimize Energy Performance
posted by  Blas Beristain  on 

Hellow Everyone, 1) In the case of a technical space (equipment room) that is a Conditioned Space as per ASHRAE 90.1 and, therefore, must be simulated as a heated/cooled reference office space: Sh

3
Mon Dec 17, 2012, 8:26 pm

Case 1, Energy cost paid by the tenant

CI-2009 EAc3:Measurement and Verification
posted by  Rubén M. R.  on 

In this case the tenant has a contract with the utility company and pays for his electricity.

3
Default Avatar
Designer, Sustainability Department
LEEDuser Basic Member
2 thumbs up
Mon Dec 17, 2012, 7:48 pm

Laminate Countertop Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Erin Cowan  on 

What category would a Wilsonarte Laminate Adhesive fall under?

3
Default Avatar
Sustainability Coordinator
The McKinney Partnership Architects
LEEDuser Basic Member
1 thumbs up
Mon Dec 17, 2012, 4:51 pm