Topic | Recent |
---|---|
Mixed-use buildingNC-v4 LTc8: Green vehiclesposted by CT G on Mar 13, 2024, 2:02 pm
We are working on a project with three towers (30 floors above grade) with a common base (ground floor and the first two floors are shared by the three towers). Two towers are multi-family... Last reply: Emily Purcell, Mar 14, 2024, 3:35 pm |
|
IN- Heat Island Mitigation with Cool WallsNC-v4.1 INc1: Innovationposted by Jorge Ramírez Hernández on Mar 14, 2024, 3:04 pm
Greetings, Currently I’m working on a building extension pursuing a LEED BD+C New Construction, the IN- Heat Island Mitigation with Cool Walls credit is being attempted, although some... |
|
Any HAP file that contain both of the proposed building and the baselineNC-v4 EAp2: Minimum Energy Performanceposted by Mohamed Abdelrahim Abdelaal on Jul 30, 2019, 7:33 am
I’m new in modeling, I have a building need to be simulated for leed rating, Can you please share a "HAP" file that contain both of the proposed building and the baseline for any project as a... Last reply: Abdullah Tahir, Mar 15, 2024, 5:04 am |
|
Concrete Mixes Counting as Separate Products- One EPDNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on Jul 2, 2019, 11:49 am
The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition... Last reply: Allison Para, Mar 15, 2024, 10:10 am |
|
Collection rainwater area outside the boundary- SS Rainwater ManagementNC-v4.1 SSc4: Rainwater managementposted by Juliana Candido on Mar 15, 2024, 4:38 pm
We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered. We have the rainwater collection area on... |
|
Option 2 Path 1- any experience to share?NC-v4.1 LTc3: High Priority Site and Equitable Developmentposted by Emily Purcell on Jan 3, 2024, 4:52 pm
Hi LEED users! We had a thread in this forum back in 2022 about Option 2 Path 1, with a lot of good ideas for how to potentially earn the credit. But I don't think we ever had an update on... Last reply: Nisha Kakde, Mar 15, 2024, 5:46 pm |
|
Inclusion of Process Waste in Waste Performance CalculationEBOM-v4.1 MRp3: Waste Performanceposted by Subhashkumar A on Mar 16, 2024, 6:44 am
Hello, Our project building is a garment building, and its final product is dresses. It generates fabric waste during the production process, inherent to the nature of the production... |
|
No-irrigation documentationNC-v4 WEp1: Outdoor water use reductionposted by Alexia Anastassiadis on Dec 12, 2022, 6:22 am
Hi all, Last reply: Afogreen Build, Mar 17, 2024, 9:04 pm |
|
Does 100% previously disturbed area (or 100% greenfield) qualify for this credit?NC-v4 SSc2: Site development - protect or restore habitatposted by Kathy Wong on Apr 13, 2021, 6:18 am
Hi all, The credit requires 1) preserve 40% of the... Last reply: Afogreen Build, Mar 17, 2024, 9:12 pm |
|
Energy modeling for unconditioned human occupied spacesNC-2009 EAp2: Minimum Energy Performanceposted by Yusuf Turab on Jul 15, 2010, 4:02 pm
I recently attended a course on energy modeling using eQuest. I was puzzled by the response of the instructor when asked how can one model an office building that is completely unconditioned.... Last reply: Muhammad Farooq Saeed, Mar 17, 2024, 9:26 pm |