Topic | Recent |
---|---|
ACPHomes-v4 EQp4: Radon-resistant constructionposted by Gustavo De las Heras Izquierdo on Mar 8, 2018, 12:39 pm
Hallo, Many countries do not have mapped radon levels as accurately as EPA requires. Can countries marked in orange and green in the following study be considered as "out of EPA zone 1"?... Last reply: Van Jomel Garcia, Mar 11, 2024, 3:24 am |
|
Lighting Control in blood draw spacesHealthcare-v4 EQc6: Interior lightingposted by Heather Belsey on Mar 11, 2024, 3:56 pm
For the lighting credit you need to have individual controls at 90% of patient positions. LEED defines patient positions as: A patient bed, infusion chair, recovery... |
|
Future open space preservation- Campus projectNC-v4 SSc3: Open spaceposted by Andy Rhoades on Jan 17, 2023, 1:46 pm
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e. plans,... Last reply: Afogreen Build, Mar 11, 2024, 8:50 pm |
|
Could cycle paths count as open space?NC-v4 SSc3: Open spaceposted by Rachael McGinley on May 16, 2021, 2:02 pm
Hi, Last reply: Dave Hubka, Mar 12, 2024, 7:16 am |
|
High Rise ResidentialNC-v4 EAc3: Advanced Energy Meteringposted by Megan White on May 31, 2016, 6:44 pm
We have a 24 story high rise residential apartment project that wants to pursue this credit however we are looking for guidance as this seems more geared towards commercial office projects with... Last reply: , Mar 12, 2024, 11:25 am |
|
EPD of aluminium systemsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Mary Brown on Mar 11, 2024, 4:34 am
Hello everybody, I have a question regarding the necessity for EPD concerning aluminium profile or aluminium system to a LEED project. Regading aluminium systems (eg aluminium window),... Last reply: Michelle Bombeck, Mar 12, 2024, 11:43 am |
|
Pilot credit RequirementPilot-Credits SSpc55: Bird collision deterrenceposted by on Mar 12, 2024, 1:05 pm
Commenting to comply with credit requirements. Credit language is clear and the team was able to implement without trouble. The project used a highly reflective glazing to comply. |
|
MRpc103 Integrative Analysis of Building MaterialsNC-v4 INc1: Innovationposted by Lisa Bolle on Oct 24, 2023, 5:12 pm
As our project team was performing the analysis of three products, we realized that another potentially useful strategy would be to compare three similar products and use the integrative analysis... Last reply: Maegan Sweeney, Mar 12, 2024, 5:06 pm |
|
Non-linear primary direction of travel.NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Michelle Halle Stern on Jul 14, 2023, 12:44 pm
Our entry includes a centered revolving door with people doors on either side. The path of travel from the people doors requires people entering to change directions toward the center of the room... Last reply: Afogreen Build, Mar 13, 2024, 4:43 am |
|
EV space accessibilityNC-v4.1 LTc8: Electric Vehiclesposted by Lawrence Rennell on Oct 9, 2023, 12:20 pm
Do all EV spaces required to be available to the general public? We are working on a project with parking spaces located within a restricted access area that will not be accessible to the general... Last reply: Michelle Bombeck, Mar 13, 2024, 11:36 am |