Forum quick links
SSc4.3 & SSc4.4: Rounding to the 5% requirement
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Vinsu Shah on
Our project was recently denied both of these credits on not meeting the 5% requirement.
LED-lights always more efficient? Why not include them?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Maria Porter on
I am pursuing this credit for a CI project as an ID credit. I am wondering, in order to comply with the overall value of 90 pg Hg/(lm*h), I need to include all my LED lamps.
IEQc8.1 Day Lighting exempt spaces
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Brady Hartmann on
I am trying to determine if a specific room can be excluded from the day lighting calculation.
Outdoor Air Contamination
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Norma Lehman on
We have a project that has failed an IAQ test by exceeding TVOC levels.
NC 2009 - Green Cleaning ID credit
NC-2009 IDc1:Innovation in Designposted by Joseph Ford, AIA on
Maybe I haven't looked in the right place but I have read many comments and haven't found clarity on what a proven strategy is for earning a green cleaning ID credit in NC 2009.
infiltration
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
If I model a building where there is mechanical ventilation, how shall I consider the infiltration (i.e.
WE p1 for Commercial Interiors Retail - Process Water Use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by María Fernanda Aguirre on
Hi every one: I am working in a project in Chile, it is a Foodmarket located within a Mall which is also pursuing LEED Certification.
Paint Certified by Eco Label Organization
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jackson . on
Does Paint or sealant certified by eco label (based on ISO 14024) can contribute weight into this credit?
EAP2 and EA1 appeal
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
my EAP2 was awarded but EA1 was denied. I would like to appeal for 10 points of EA1. What should I do?
Submit EAp2 & EAc1 Design Phase, Add Renewable Energy Later
NC-2009 EAc1:Optimize Energy Performanceposted by Ralph Bicknese on
Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the renewable energy system.