Log in
Forum
Topic

Last chance to comment on LEED v5

LEED v5 BD+C/ID+C: Energy and Atmosphere 2nd Public Comment
posted by Nadav Malin on Sep 27, 2024, 9:57 am

Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread.

The...

Last reply: Lenka Matějíčková, Oct 31, 2024, 12:37 pm

How to Model Proposed and Baseline HVAC system for a District level heating and Cooling system

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm

Hi, 

I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a...

Last reply: Manuel Romera Molina, Nov 11, 2024, 2:53 am

District heating and Cooling

NC-v4 EAp2: Minimum Energy Performance
posted by Greenlab on Jun 21, 2018, 2:36 pm

Hello Everyone,

I am currently modeling (Design Builder) a building which essentially consists of a mix of laboratories and office spaces. This building is supplied by a District heating (...

Last reply: Tyler Thumma, Feb 17, 2022, 10:22 am

Baseline Fan Power Calculation (kW/CFM)

NC-2009 EAp2: Minimum Energy Performance
posted by Nina N on Jan 15, 2010, 7:32 am

to post comments Jean Marais b.i.g. Bechtold DesignBuilder Expert LEEDuser Basic Member 832 thumbs up January 25, 2010- 11:17 am Thank you for the explanation. Pitty there's no ASHRAE forum as good...

Last reply: Marcus Sheffer, Apr 9, 2018, 11:34 am

Dormitory that is No Smoking

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by April Ambrose on Jan 26, 2010, 6:02 pm

I have a NCv2009 project that is a dormitory on a college campus.

This is a case where the reference guide and LEED Online do not seem to match. We have a dormitory project that is not...

Last reply: Tristan Roberts, Mar 11, 2011, 8:58 am

Team roles and responsibilities

NC-2009 EAc3: Enhanced Commissioning
posted by Kath Williams on Feb 11, 2010, 4:27 pm

House of Representatives LEEDuser Expert 11477 thumbs up February 17, 2011- 2:57 pm Not your fault... we just inverted the forum last week so that new comments are first. Thanks for participating. Log...

Last reply: Tristan Roberts, Feb 17, 2011, 2:57 pm

Classifying Products

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Adolfo Silva on Feb 24, 2010, 10:03 am

Hello,

I'm working on a project and the...

Last reply: Mara Baum, Aug 23, 2010, 2:47 pm

CxA for Enhanced...

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jean Marais on Mar 4, 2010, 5:29 am

PARTIES EXCLUDED FROM APPLYING
The following are disqualified from applying:
1. Employee or subcontractor of general contractor with construction responsibilities
2. Employee or...

Last reply: Karen Stewart, Mar 16, 2010, 11:53 am

parking garage

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Lisa Marshall on Mar 10, 2010, 5:17 pm

I have a project where I have an existing parking garage on a campus that has PV's on the roof. This parking garage is not part of our LEED site boundary, can I still earn SSc7.1?

Last reply: Lorenzo Bersanetti, Apr 14, 2011, 6:42 am

Tracking Tool

CS-2009 MRc2: Construction Waste Management
posted by Rand Ekman on Mar 11, 2010, 6:43 pm

Looking for examples of tracking tools that work for a...

Last reply: RETIRED, Jul 15, 2012, 2:09 pm