when is the weatherproofing enclosed
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jaida Anderson-Lozano on
We are building a 13 story building that will have the envelope panels in place two years before all openings will be enclosed.
Training Program?
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Robert Andrews on
Any suggestions on a source for templates that can be used to document a staff training program? I am actually working with LEED EB v2.0, EAc3.1. Thanks!
Educational building program
NC-2009 IDc1:Innovation in Designposted by Diaa Madkour on
hi, Anyone has a reference or sample of the educational building program plan? and can anyone experienced through this credit advise about what is needed for its documentation?
Heat Pipe Simulation for EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Kai Andrade on
How do I simulate a heat pipe in the Baseline case? The proposed case has two split DX AHUs serving 22 & 15 zones respectively.
Meeting EAp2 in Zone 1 without A/C?
NC-2009 EAc1:Optimize Energy Performanceposted by Katrina Morgan on
We are starting design for a residential tower in Zone 1 (Hawaii) that will use natural ventilation and no mechanical air conditioning.
some doubts
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Albert Sagrera on
Hi, in our project we have a 60% of the site vegetated, planted with meadow, we have a small impervious surface near the building, and the building itself.
Multiple buildings on a single site
posted by Michael E. Edmonds-Bauer on
We have a project with two independent buildings on a single site.
IEQc4.4
posted by Joel McCreary on
We are not pursuing IEQc4.4 for our project. However, the contractor has stated that we may be able to add it.
FTE MULTIPLE SHIFTS
posted by Diaa Madkour on
We are pursuing LEED NC 2009. We are designing a call centre office building which will be operated 24 hours on three consecutive 8 hours shift work.
Apartment/Dorm
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Tommy Linstroth on
Reading the guidance and from past projects its always been pretty straightforward for showing compliance with an apartment or dorm when every room has an on/off switch.