Topic | Recent |
---|---|
Site with a mix of developed and undeveloped areasNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on May 12, 2020, 5:22 am
Dear All, Option 1 requires on-site management of the runoff from the developed site for the 95th or 98th percentile of local rainfall events. ... |
|
Runoff volume managed for more than leed boundaryNC-v4 SSc4: Rainwater managementposted by Sofia Barahona on May 13, 2020, 5:14 pm
We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago. The stormwater management and design was... |
|
Calcium silicate adhesive and PVC jacket adhesiveNC-v4 EQc2: Low-emitting materialsposted by Mark Meaders on May 14, 2020, 9:30 am
We have a project in which we are looking for calcium silicate adhesive and PVC jacket adhesive for mechanical/ plumbing use that comply with the... |
|
NC- v4 MRc2 thru MRc4 as they relate to site work and divisions 31 and 32NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Louis Harris on May 15, 2020, 10:17 am
We are looking for direction and help in finding LEED qualifying credits in division 31 and 32. |
|
Shuttle ScheduleWarehouses-NC-v4 LTc5: Access to quality transitposted by Ricardo Sá on May 18, 2020, 8:26 am
Dear All, |
|
Parking garage ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Lisa Loreti on May 18, 2020, 2:16 pm
The Project Team needs some clarifications about parking garage ventilation. We have three different questions, not linked to each other.
|
|
AIR PURIFIER INTEGRATION FOR RESIDENTIAL USENC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Jackson Eagle on May 19, 2020, 11:41 am
Hello, I am fairly new to all this and your patience is appreciated. I am wondering what LEED credits, if any, are given if the developer makes a decision to implement air purifiers in... |
|
Incorrect FGI referenceHealthcare-v4.1 EQc9: Acoustic performanceposted by John McFarland on May 19, 2020, 2:34 pm
For Option 1, the credit requirement refers to Section 1.2-5.1.6 and Section 1.2-5.1.6.2 in 2018 FGI Guidelines for Design & Construction of Hospitals. However, there are no such sections in... |
|
Renewable Energy documentation for a Campus ProjectLEED Guidance for Campuses and Multiple Buildingsposted by Hashir Usman on May 20, 2020, 10:21 am
Hi all, I would like to ask that if the owner is planning to install solar energy generation on the campus site and this energy is to be provided to the existing buildings also which are... |
|
Fire Station Apparatus Bay Filtration RequirementNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Elizabeth Hargrave on May 20, 2020, 11:46 am
I am working on a Fire Station Project. We are going for the EQ Credit: Enhanced Indoor Air Quality Strategies Option 1. We are mechanically ventilated in both the Fire Station living spaces... |