Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline estimate for an exterior Green Wall?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Janika McFeely  on 

Hi all, We have a tight urban condition with a large expanse of exterior green wall. Any thoughts on what to use for a baseline for this? Can we use an equivalent area of lawn?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 20, 2013, 10:31 pm

GS-42 Certified service providers

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Steve Loppnow  on 

Can anyone provide feedback on the benefits of contracting with a GS-42 Certified service provider from a LEED perspective?

2
Sustainability Operations Director, East Coast
Healthy Buildings
LEEDuser Basic Member
37 thumbs up
Wed Mar 20, 2013, 9:54 pm

Alternative walk-off mat materials

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Tiffany Moore  on 

I've been asked to evaluate a recycled rubber entry system under the "carpet tile" concept.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 20, 2013, 7:38 pm

Unconditoned Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Chinthaka Jagodaarachchi  on 

There are several unconditioned spaces in a project that I'm working on. For Energy simulation, should those spaces be modeled as having cooling & heating systems?

5
Wed Mar 20, 2013, 7:27 pm

Multiple Buildings - Group certification

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Jean-Baptiste Noel  on 

We are working on a project that has three different buildings on a previously developed site, for which we want to submit a Group Certification; it is mentionned in the associated guide that the '

2
Wed Mar 20, 2013, 6:46 pm

No pope yet

General forums
posted by  Tom Lent  on 

This credit needs a good rest in the Pilot Library!

5
Wed Mar 20, 2013, 6:29 pm
5
Wed Mar 20, 2013, 3:44 pm

Is LEED Online compatible with Windows 8?

Living with LEED Online - quirks, bugs and hiccups
posted by  Marcio Alberto Casado Pereira  on 

I'm at Windows 8 and when I enter the LEED Online initial page it starts to beahve very weird...it moves, the dark ribbon from the top of the page goes down. Does anyone know?

2
Wed Mar 20, 2013, 1:56 pm

Eligibility based on absense of system

General forums
posted by  Timothy Nabholz  on 

Hey all, I was wondering if there was any notion on whether there were thoughts to award points to those who do not have a negative aspect on their project. Ie.

2
Wed Mar 20, 2013, 8:56 am

Regarding Level of Sub metering

CI-2009 EAc3:Measurement and Verification
posted by  Maria Porter  on 

Hi Have I understood it correctly, that for a tenant less than 75 %, it is enough to sub meter the electricity for that tenant (plug loads and lighting) in one meter?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 20, 2013, 7:30 am