Forum quick links
Baseline estimate for an exterior Green Wall?
NC-2009 WEc1:Water Efficient Landscapingposted by Janika McFeely on
Hi all, We have a tight urban condition with a large expanse of exterior green wall. Any thoughts on what to use for a baseline for this? Can we use an equivalent area of lawn?
GS-42 Certified service providers
EBOM-2009 IEQp3:Green Cleaning Policyposted by Steve Loppnow on
Can anyone provide feedback on the benefits of contracting with a GS-42 Certified service provider from a LEED perspective?
Alternative walk-off mat materials
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Tiffany Moore on
I've been asked to evaluate a recycled rubber entry system under the "carpet tile" concept.
Unconditoned Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Chinthaka Jagodaarachchi on
There are several unconditioned spaces in a project that I'm working on. For Energy simulation, should those spaces be modeled as having cooling & heating systems?
Multiple Buildings - Group certification
NC-2009 SSc2:Development Density and Community Connectivityposted by Jean-Baptiste Noel on
We are working on a project that has three different buildings on a previously developed site, for which we want to submit a Group Certification; it is mentionned in the associated guide that the '
No pope yet
posted by Tom Lent on
This credit needs a good rest in the Pilot Library!
Is LEED Online compatible with Windows 8?
posted by Marcio Alberto Casado Pereira on
I'm at Windows 8 and when I enter the LEED Online initial page it starts to beahve very weird...it moves, the dark ribbon from the top of the page goes down. Does anyone know?
Eligibility based on absense of system
posted by Timothy Nabholz on
Hey all, I was wondering if there was any notion on whether there were thoughts to award points to those who do not have a negative aspect on their project. Ie.
Regarding Level of Sub metering
CI-2009 EAc3:Measurement and Verificationposted by Maria Porter on
Hi Have I understood it correctly, that for a tenant less than 75 %, it is enough to sub meter the electricity for that tenant (plug loads and lighting) in one meter?