A Study on the Implementation of Green BuildingsLEED v4.1 Discussion Forumposted by Augustus C. on Mar 19, 2020, 12:36 am
Greetings, I'm a Senior High School student currently working on a research related to the course I'm soon taking (engineering) and we're currently having difficulties with our research.... |
|
Shopping center ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Ricardo Sá on Mar 19, 2020, 4:51 am
Dear All, One of our client is evaluating the possibility of certifying a Shopping Center using LEED v4 BD+C. In what relates with EA P1:
|
|
LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?NC-v4 MRc1: Building life-cycle impact reductionposted by J Schütz on Mar 20, 2020, 9:04 am
Dear all, as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it... |
|
LEED EB v4.1- Data CentersEBOM-v4.1 EAp3: Energy Performanceposted by Vanni arasan on Mar 23, 2020, 11:24 am
I am working on LEED v4.1 EB O&M Datacenter rating system, I haven't getting Energy Performance score. Please advise how to enter the energy data i.e., Whole Facility Energy Consumption... |
|
Chinese standard GB 18582-2008 'Indoor decorating and refurbishing materials...'NC-v4 EQc2: Low-emitting materialsposted by Olga Yuil on Mar 24, 2020, 4:33 pm
Does any know if the chinese standard GB 18582-2008 'Indoor decorating and refurbishing materials. Limit of harmful substances of interior architectural coatings' complies with the low... |
|
Freight hubLEED Rating System Selectionposted by Sam Tognet on Mar 25, 2020, 6:16 am
Hello, The project consists in a freight hub located in France. It is composed of a 2000 square meter warehouse, a side of which being dedicated to a part composed of a dozen office rooms... |
|
Option 1 Warehouse Exceptions for Multi-occupant spaces?Warehouses-NC-v4 EQc6: Interior lightingposted by Sara Greenwood on Mar 25, 2020, 2:24 pm
Hello, It seems unreasonable or energy efficient for the multi-occupant spaces in a storage warehouse to meet the criteria for Option 1 in this credit. Are there any exceptions for... |
|
Qualifying compliance to Extreme Heat design parametersPilot-Credits IPpc99: Design for Enhanced Resilienceposted by Jolene McLaughlin on Mar 25, 2020, 5:50 pm
Does anyone have a view of what would qualify to meet some of the subjective requirements in the Extreme Heat design measures? Statements like "High levels of insulation" and "lower Solar Heat... |
|
No separate meter for water performanceEBOM-v4 WEc4: Water meteringposted by Phung NGUYEN on Mar 26, 2020, 3:32 am
Our Office located in a group building of manufacturing was having one main meter that measures the total potable water. So, we don't have the permanent water meter for the Office. Thus,... |
|
WE Prerequisite 1EBOM-v4 WEp1: Indoor water use reductionposted by Alice Andersen on Mar 26, 2020, 11:26 am
I have a lavatory faucet that are automatically controlled (sensor control) and a flow rate of 5 l per minute. In accordance to the LEED manual the baseline is 1.9 l per minte. When the... |