Forum quick links
New Construction project with warehouse and bus parking
NC-v4 LTc8:Green vehiclesposted by Dina El-Sady on
The project is a production building with a connected warehouse and small office building , the parking located within the LEED project boundary is inclusive of bus parking used for building occupa
Option 2 and / or Option 3
Retail-CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Ian McCall on
Dear LEED Experts,
I woud like to use Option 3 and Option 2 to achieve the maximum number of point and even an Exemplary level point.
Small Storm Hydrology Method - Run off volume Question on metrics
NC-v4 SSc4:Rainwater managementposted by Stephan Zweig on
Hello to all Users,
I have following question:
Listing the TVOC Ranges
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
For the CDPH Standard Method v1.2-2017 evaluation In V4 you had to specify the TVOC ranges: 0.5 mg/m3 or less, between 0.5 and 5 mg/m3, or 5 mg/m3 or more.
Minimum OA and makeup air
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello,
Cooling Tower is used for process water ( Factory project )
NC-v4 WEc3:Cooling tower water useposted by Youssef Hisham on
We are in a factory project and the cooling tower is used for the process water for the factory equipment. So, Does the cooling tower credit requirement applies to our project ?
LEED C&S - No Landscaping in Scope
CS-v4.1 WEp1:Outdoor Water Use Reductionposted by Levi Jimenez on
We have a LEED v4.1 Core & Shell project with no Landscaping in the scope of work.
Monitoring - Measurement of Supply / Return Air Flow - Speed in VAV Recirculating AHU
NC-v4 EQp1:Minimum indoor air quality performanceposted by Omer Moltay on
Dear All,
Bird Collision
Pilot-Credits SSpc55:Bird collision deterrenceposted by Andrea Cabllero on
Hello. I would love to know what startegies have you found to have the greates impact in reducing bird collition in a project?