Forum quick links
Calculating peak occupancy
posted by Alexia Anastassiadis on
We are working on a project with 4 different shifts. One regular 8 to 5 shift for office and morning afternoon and night shifts for factory workers, there no transients or visitors.
Mechanical plans ando/or drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by JOSE R. TAGLE on
Hello, I'm on a New Construction project and Preform4 asks for Mechanical plans and/or drawings, i'm not sure if these refer to HVAC plans only, or if it includes other plans such as MEP ones (HVAC
Renovation of 3rd Floor Surgical Suite in Four Story Hospital
posted by Jeff Russell on
I am designing a renovated surgical suite consisting of 39,789 sf of project area. The total floor plate is 103,223 sf. The building is type I construction with a primary I-2 Occupancy.
How many credit points does one get by offsetting 7%.
CS-2009 EAc2:On-site Renewable Energyposted by Tuana Papile on
By using on-site renewable energy for 7% of the total energy, do we get now 7 points compared to the 4 points for NC? Thank you
Control of verhead lighting through VOIP phone integration
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Would VOIP phone integration lighting controllability of individual workstations (in open offices) count towards the credit, instead of using task lighting?
Glazing Sealant / Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
Does a glazing sealant get logged under the structural glazing adhesive category? Or should it be logged under Interior Sealants - Architectural?
Additions
Healthcare-v2009 IEQp3:Hazardous material removal or encapsulation (renovations only)posted by Catherine Blakemore on
Our project is an Addition to an existing structure. The LEED boundary for the project is just the addition and does not include any of the existing building.
EAp2 for fill and finish plant with labs
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ramon Gomez on
Hi, Our facility is a manufacturing plant (43% fill and finish space) with laboratories (8% space) and refrigerated warehouses (40%).
Does 10-4 Mandatory provision apply for process electric motors?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to the indu
European Project with LEED v4 strategy
NC-2009 MRc2:Construction Waste Managementposted by Jaida Anderson-Lozano on
We have a project in Europe and like many other projects in Europe we are incinerating majority of our construction waste for energy reuse.