Calculating peak occupancy

Calculating FTEs
posted by  Alexia Anastassiadis  on 

We are working on a project with 4 different shifts. One regular 8 to 5 shift for office and morning afternoon and night shifts for factory workers, there no transients or visitors.

3
Fri Apr 5, 2013, 2:39 pm

Mechanical plans ando/or drawings

NC-2009 PIf4:Schedule and Overview Documents
posted by  JOSE R. TAGLE  on 

Hello, I'm on a New Construction project and Preform4 asks for Mechanical plans and/or drawings, i'm not sure if these refer to HVAC plans only, or if it includes other plans such as MEP ones (HVAC

2
Thu Apr 4, 2013, 8:42 pm

Renovation of 3rd Floor Surgical Suite in Four Story Hospital

LEED Rating System Selection
posted by  Jeff Russell  on 

I am designing a renovated surgical suite consisting of 39,789 sf of project area. The total floor plate is 103,223 sf. The building is type I construction with a primary I-2 Occupancy.

3
Default Avatar
AIA, LEED AP BD+C
LEEDuser Basic Member
0 thumbs up
Thu Apr 4, 2013, 8:21 pm

How many credit points does one get by offsetting 7%.

CS-2009 EAc2:On-site Renewable Energy
posted by  Tuana Papile  on 

By using on-site renewable energy for 7% of the total energy, do we get now 7 points compared to the 4 points for NC? Thank you

6
Thu Apr 4, 2013, 6:34 pm

Control of verhead lighting through VOIP phone integration

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Would VOIP phone integration lighting controllability of individual workstations (in open offices) count towards the credit, instead of using task lighting?

2
Thu Apr 4, 2013, 5:33 pm

Glazing Sealant / Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Catherine Blakemore  on 

Does a glazing sealant get logged under the structural glazing adhesive category? Or should it be logged under Interior Sealants - Architectural?

4
Default Avatar
LEED AP BD+C ,Homes,IDC,OM
LEEDuser Basic Member
17 thumbs up
Thu Apr 4, 2013, 3:46 pm

Additions

Healthcare-v2009 IEQp3:Hazardous material removal or encapsulation (renovations only)
posted by  Catherine Blakemore  on 

Our project is an Addition to an existing structure. The LEED boundary for the project is just the addition and does not include any of the existing building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 4, 2013, 3:21 pm

EAp2 for fill and finish plant with labs

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Ramon Gomez  on 

Hi, Our facility is a manufacturing plant (43% fill and finish space) with laboratories (8% space) and refrigerated warehouses (40%).

3
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Apr 4, 2013, 2:56 pm

Does 10-4 Mandatory provision apply for process electric motors?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to the indu

7
Thu Apr 4, 2013, 2:40 pm

European Project with LEED v4 strategy

NC-2009 MRc2:Construction Waste Management
posted by  Jaida Anderson-Lozano  on 

We have a project in Europe and like many other projects in Europe we are incinerating majority of our construction waste for energy reuse.

5
Default Avatar
Building engineer
AF Gruppen Norge AS
LEEDuser Basic Member
6 thumbs up
Thu Apr 4, 2013, 2:26 pm