Change in lighting schedules due to increased daylighting.
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Dear community, we are doing a 90.1 App. G simulation for an existing manufacturing warehouse renovation + office building addition.
VAV Systems
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by David Hubka on
When demonstrating ASHRAE 62.1 compliance for VAV systems, what is the best approach to simulate worst case system conditions expected during normal ventilation operations?
Filling out the credit form for Option 2 Path 1
NC-2009 WEc1:Water Efficient Landscapingposted by Erin Holdenried on
I have a project that is using captured rainwater only, no potable water, to supply the irrigation system. However, the credit form does not seem to have this option.
Compressed Natural Gas Excavation Equipment
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Janna Nash on
Can anyone tell me if there is a LEED NC credit that would "reward" a project for using Compressed Natural Gas in excavation and other construction equipment?
LEED AP Consultant Fee
EBOM-2009 IOc2:LEED Accredited Professionalposted by Rodney Berry on
I am currently working on a project in conjunction with my MBA studies regarding LEED EB certification.
Cradle to cradle certificate as ACP?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Isolda Strom on
Dear All, I am working on a LEED project in Europe. Our architect is applying several products with Cradle to cradle certificates.
Mandatory provisions for a heat pump
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I have to model a heat pump that outside the building exchanges heat with the external air and it exchanges heat with the building, i.e. with the internal part of the HVAC plant, thorough water.
Water Efficient landscaping - finding the ETo
NC-2009 WEc1:Water Efficient Landscapingposted by Robert Thomas, CPD, LEED AP BD+C on
How can I find the evapotranspirtaion rate, ETo, for various plants in various regions, and can this be found on LEEDuser's website?
Would this apply to International Projects too ?
posted by Mike Barker on
Does this apply to projects outside continental USA ? And about Alternative Compliance Paths in particular ?
Two hotels, same Developer, but not connected. Rating System?
posted by Jay Murray on
Hi. Two brand new hotels in Boston in conceptual design now, one is 200,000 sf, the other is 150,000 sf. They are separated by a street (also owned by the developer).