Forum quick links
Survey methodology
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Aurélien Graux on
Hi, Concerning the survey, i would like to have your opinion about the stastiscal viability of my method.
Preferred Parking - defined
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Lee Koepke on
Hello LEED Community!
World Cup Arena FTE calculation
NC-2009 PIf3:Occupant and Usage Dataposted by Marcio Alberto Casado Pereira on
We are working on one of the new arenas for the next world cup and we have two scenarios regarding population and space usage types: the first one is the world cup scenario: there will be spaces de
Previously Developed Definition
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michelle Rosenberger on
The previously developed site definition reflected in the narrative above is one that I'm familiar with from a fairly recent addendum.
Denatured Alcohol used by Window Installers at Interior
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Brooks Critchfield on
I encountered Denatured Alcohol on my jobsite this afternoon.
Proper filenaming for uploading
NC-2009 PIf4:Schedule and Overview Documentsposted by Brooke Odom on
I have a simple questions but I can't seem to find the answer. What is the required filename format for uploading documents?
SSc4 how i must count residents
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Markus Henning on
Hi, in my project 10% oft the total building area are residential in the top floor of a office/retail building. My question is, how i must include the residents in the survey? Thanks
Recycling space inside vs. outside
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Michelle Rosenberger on
Tristan, As you can see from the two longer threads here, several of us are struggling with the issue of dedicated recycling areas inside the building vs.
100' Wetland - previously developed
NC-2009 SSc1:Site Selectionposted by Kris Phillips on
The credit requirements excuse "previously developed" sites for 1) the 100-year floodplain and 2) within 50' of a water body. This is not specifically mentioned 3) within 100' of wetlands.
Mechanical equipment compartments as roof surface
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Alessio Zampaglione on
Hi everyone, I’m working on a project registered under LEED 2009 C&S Rating System.