Topic | Recent |
---|---|
LVR wood stain and concrete sealerCI-v4 EQc6: Interior lightingposted by Sue Bryant on Aug 7, 2019, 10:46 am
How do you find the LVR for these products? |
|
LEED V4.1 EBO+M Minimum Program RequirementsLEED v4.1 Discussion Forumposted by Ben McEwen on Aug 7, 2019, 11:57 am
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 does use these MPRs for... |
|
MERV 11 in garage unitNC-v4 EQp1: Minimum indoor air quality performanceposted by Johanna Koch on Aug 8, 2019, 3:25 am
Do you have to have... |
|
"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoningCS-2009 SSc4.4: Alternative transportation - parking capacityposted by Edgar Arevalo on Aug 9, 2019, 2:36 pm
1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet... |
|
certification of an airprt's TerminalLEED v4.1 Discussion Forumposted by Evangelia Mertziou on Aug 12, 2019, 5:28 am
Is it achievable the LT Credit "Surrounding Density and Diverse Uses", Option2 for the certification of an airport's Terminal? Could the diverse uses (Restaurant, Cafe, Bank, Hair Care,... |
|
Compliance to ASHRAE 90.1-2010- Dimming LightsCS-v4 LTc7: Reduced parking footprintposted by Summer on Aug 14, 2019, 12:57 am
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking. The parking slots are not solely for the office tower (office towers are the ones that... |
|
Percentage Improvement using GHG emission metricNC-v4.1 EAc2: Optimize Energy Performanceposted by Pan Pan on Aug 14, 2019, 3:18 am
Hi, How is the calculation for... |
|
ROI for LEED at Healthcare CampusLEED Guidance for Campuses and Multiple Buildingsposted by Barbara Hamilton on Aug 14, 2019, 1:07 pm
Please share any reports or data that exemplifies the ROI of building and operating a LEED building, specifically for healthcare, i.e. Acute Care Hospital and Out Patient Pavillion. |
|
VLT x WFR TOO HIGH?NC-2009 IEQc8.1: Daylight and views - daylightposted by Elissa Wu on Aug 14, 2019, 4:05 pm
Hello I am inputting a regularly occupied space in the calculator via the sidelighting prescriptive method. The Zone Floor Area is 148 SF (which is the nearly the size of the entire space... |
|
Fresh Air Requirement for Dwelling UnitsNC-v4 EQp1: Minimum indoor air quality performanceposted by Pan Pan on Aug 18, 2019, 10:40 am
Hi! Can I use 62.2-2010 instead of the 62.1-2010 ventilation rate calculation procedure for dwelling units? The project is a 4-story apartment building? Thanks. Hope you can help me. |