Joint Use of Facilities Credit Use!Schools-2009 SSc10: Joint Use of Facilitiesposted by Bayardo Selva on Jul 8, 2019, 12:42 pm
I submitted a Memo on Letterhead stating which parts of the facilities where going to be used on non school hours. However, LEED also wants an a Shared use policy? I have done same documentation... |
|
LEED v4.1 Life Cycle Analysis DocumentationLEED v4.1 Discussion Forumposted by Isik Goren on Jul 11, 2019, 4:06 pm
I am doing LCA with ATHENA Impact Estimator. The v4.1 allows to get 1 point if a LCA is done, without a baseline building comparison. |
|
Following Strategy A but no D for regularly occupied spaceNC-v4 EQc6: Interior lightingposted by Edgar Arevalo on Jul 12, 2019, 11:12 am
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle... |
|
Entryway system extends into elevatorNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Angela Barreto on Jul 12, 2019, 5:25 pm
Hi, we have a project with a complying entryway system at ground level. However, the LEED reviewer has pointed out an entryway system is also required at the elevator lobby in our... |
|
LEED ND v4 Pilot Credit Integrative Process- Participation in the ForumPilot-Credits IPpc101: Integrative processposted by Charlotte Bodnar on Jul 15, 2019, 10:47 am
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification. A list of team... |
|
Single Family Homes, MR Credit: Environmentally Preferred Products- Local ProductionLEED v4.1 Discussion Forumposted by Walter Broner on Jul 17, 2019, 4:19 pm
Apologies if this has been answered already. Option 1 has a 50% threshold for each building component that could meet the criteria. Is the calculation supposed to be done by cost,... |
|
Confirmation of maximum point scoring and points tableCI-v4.1 EAc4: Renewable energyposted by Han Qiang Ler on Jul 17, 2019, 10:02 pm
There appears to have a discrepancy in the guide dated 04_09_2019 version. The credit scorecard shows 6 points as maximum point, but the specific section mentioned that this is a prerequisite and... |
|
Grid resilience technologiesCS-v4.1 EAc4: Grid Harmonizationposted by Dionisio Franca on Jul 18, 2019, 3:17 am
Does anyone know the definition of islanding and part-load operation in:
|
|
Chemical Source in GarageNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Ricardo Sá on Jul 18, 2019, 5:34 am
Dear All, I have a question regarding LEED v2009 NC IEQ C5 - Indoor Chemical and Pollutant Source Control. One of our projects has housekeeping room... |
|
Defining the baseline for the LCA creditLEED v4.1 Discussion Forumposted by Nihar Pathak on Jul 18, 2019, 11:34 am
Hello, So my question is about the baseline that needs to be defined for the LCA credit under v4.1. Would having the same design with same assemblies except that proposed re-uses... |