Future-Fit Out Spaces LEED Certified or Not
NC-2009 PIf1:Minimum Program Requirementsposted by Catherine Blakemore on
My inquiry is in reference to CIR 10102 I have healthcare project that is a surgical addition at a local hospital. The 2nd floor of this addition is a future fit-out space to be determined.
Can an Off-site parking garage be used to achieve credit?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Breffni O'Rourke on
We are examining a project that will include a multi-story parking garage that will not be within the LEED boundary.
Mult Public Connection just over the 2 mile shuttle bus rule
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Johanna Ordaz on
Our project is located within an Airport Campus. From our project site to the main terminals is about 1 mile.
Time Averaged Occupancy
NC-2009 IEQp1:Minimum IAQ Performanceposted by Patrick MacPherson on
We have been asked to help a team with their Design Review Comments and they have received a review comment for a Dining facility whereby the reviewer noted that they could use a Time Averaged Occu
Certify only a portion of a new mixed use building under NC?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bethany Beers on
We are working with a developer on a mixed use project that includes 2 "towers" connected by a commons space.
Interior Courtyards: Count as outside view or not?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Daniel Costantino on
Hi, I am working on a project where it is very likely that 90% or more of occupants will have outdoor views.
USGBC approved alternate standard to ASHREA 90.1-2007
CS-2009 EAp2:Minimum Energy Performanceposted by Amit Ahiel on
I'm working on a project outside the US, in the Middle East, and curtain wall consultant has chosen a glazing from a European manufacturer who has provided their equivalent to the Solar Heat Gain C
Choose the right one?
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Determine the interior lighting power allowance by using the columns designated Space-by-Space Method in Table 9.6.1.
IAQ Testing - no lab
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by MARIO DE JESUS CARMONA VINAS on
I have a project that will be conducting the Air Quality Testing.
Resinous Flooring - Healthcare Project
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Catherine Blakemore on
My project is installing resinous (pourable) flooring in a surgical addition. Does the mortar (binder) get logged in under the category of Ceramic Tile Adhesive (65 g/L)?