Forum quick links
Performance Period starts after construction
posted by Karin Wohlert on
Our project team is building an addition to an existing facility. The owner would like to certify the whole building.
Zero-Waste Office as LEED CI ID Credit
CI-2009 IDc1:Innovation in Designposted by Adam Knoff on
I'm working on a CI project where the tenant is planning to run a zero-waste office space. A local recycle/compost/trash hauler (Eco-Cycle) offers this service.
Can after school care be included in Joint use facilities?
Schools-2009 SSc10:Joint Use of Facilitiesposted by Shivani Langer on
The school we are getting certified will have a YMCA program for after school care for its students. it will not charge the parents (comunity) for this facility.
Hot Water - 3 Fuel Sources - Baseline Model
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, We are Energy modelling a project with 3 types of systems to heat water: 1.- Solar Collector 2.- Electrical Heat Pump 3.- Hot water Boiler - Gas For the "BASELINE" model, should I model the
Core & Shell: Electricity Use
CS-2009 EAc6:Green Powerposted by Marco Abdallah on
The electricity use determined by the whole buildinig simulation simulation in EAp2 is including also plug load on the tenant spaces (not part of the core&shell scope of work). Eac6 is automati
CalGreen and LEED Requirements for SSc4.3
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sonrisa Lucero on
I am sure someone has pursued SSc4.3 in CalGreen territory.
WC's
CS-2009 WEp1:Water Use Reductionposted by CRolim Engenharia on
Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.
HVAC to meet COP, outside US
CI-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Hi, We have a project outside US. Our AC unit able to meet stated EER in ASHRAE 90.1, but is not ARI tested.
Tenant lease clauses
CS-2009 WEp1:Water Use Reductionposted by Mike D on
If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?
Same firm as sub-contractor and CxA
NC-2009 EAc3:Enhanced Commissioningposted by Sally Marr on
I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing.