Performance Period starts after construction

Performance Period
posted by  Karin Wohlert  on 

Our project team is building an addition to an existing facility. The owner would like to certify the whole building.

8
Default Avatar
NW Sustainable Consulting, LLC
LEEDuser Basic Member
0 thumbs up
Thu May 23, 2013, 10:05 pm

Zero-Waste Office as LEED CI ID Credit

CI-2009 IDc1:Innovation in Design
posted by  Adam Knoff  on 

I'm working on a CI project where the tenant is planning to run a zero-waste office space. A local recycle/compost/trash hauler (Eco-Cycle) offers this service.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 9:36 pm

Can after school care be included in Joint use facilities?

Schools-2009 SSc10:Joint Use of Facilities
posted by  Shivani Langer  on 

The school we are getting certified will have a YMCA program for after school care for its students. it will not charge the parents (comunity) for this facility.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 23, 2013, 9:00 pm

Hot Water - 3 Fuel Sources - Baseline Model

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi, We are Energy modelling a project with 3 types of systems to heat water: 1.- Solar Collector 2.- Electrical Heat Pump 3.- Hot water Boiler - Gas For the "BASELINE" model, should I model the

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 23, 2013, 8:04 pm

Core & Shell: Electricity Use

CS-2009 EAc6:Green Power
posted by  Marco Abdallah  on 

The electricity use determined by the whole buildinig simulation simulation in EAp2 is including also plug load on the tenant spaces (not part of the core&shell scope of work). Eac6 is automati

3
Default Avatar
LEEDuser Premium Member
1 thumbs up
Thu May 23, 2013, 5:23 pm
6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 23, 2013, 3:32 pm

WC's

CS-2009 WEp1:Water Use Reduction
posted by  CRolim Engenharia  on 

Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 12:38 pm

HVAC to meet COP, outside US

CI-2009 EAp2:Minimum Energy Performance
posted by  SW LEE  on 

Hi, We have a project outside US. Our AC unit able to meet stated EER in ASHRAE 90.1, but is not ARI tested.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 23, 2013, 6:42 am

Tenant lease clauses

CS-2009 WEp1:Water Use Reduction
posted by  Mike D  on 

If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?

2
Default Avatar
LEEDuser Basic Member
45 thumbs up
Thu May 23, 2013, 1:44 am

Same firm as sub-contractor and CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Sally Marr  on 

I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing.

2
Default Avatar
Commissioning Engineer
LEEDuser Basic Member
15 thumbs up
Wed May 22, 2013, 9:46 pm