Gravel

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erin Nuckols  on 

Is there a type of gravel material that could meet the SRI requirements? Or is there a way to make gravel material meet the SRI requirements? (We are utilizing gravel for a roadway)

3
Fri May 24, 2013, 8:38 pm

Design Respons from GBCI C6.1

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Veronika Sundberg  on 

Hej, We got feedback from our design submittal with the following technical advice: “Rainfall intensity is normally dependent on the time of concentration.

6
Default Avatar
Environmental Engineer - Certification
Skanska Sverige AB
LEEDuser Basic Member
94 thumbs up
Fri May 24, 2013, 11:21 am

How to define vision glazing

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Sharlene Angeles  on 

I have a question related to the idea of "vision glazing." For our project, the users want to have a little bit of privacy from visitors looking through to the inside, but can we still achieve this

5
Thu May 23, 2013, 10:20 pm

Performance Period starts after construction

Performance Period
posted by  Karin Wohlert  on 

Our project team is building an addition to an existing facility. The owner would like to certify the whole building.

8
Default Avatar
NW Sustainable Consulting, LLC
LEEDuser Basic Member
0 thumbs up
Thu May 23, 2013, 10:05 pm

Zero-Waste Office as LEED CI ID Credit

CI-2009 IDc1:Innovation in Design
posted by  Adam Knoff  on 

I'm working on a CI project where the tenant is planning to run a zero-waste office space. A local recycle/compost/trash hauler (Eco-Cycle) offers this service.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 9:36 pm

Can after school care be included in Joint use facilities?

Schools-2009 SSc10:Joint Use of Facilities
posted by  Shivani Langer  on 

The school we are getting certified will have a YMCA program for after school care for its students. it will not charge the parents (comunity) for this facility.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 23, 2013, 9:00 pm

Hot Water - 3 Fuel Sources - Baseline Model

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi, We are Energy modelling a project with 3 types of systems to heat water: 1.- Solar Collector 2.- Electrical Heat Pump 3.- Hot water Boiler - Gas For the "BASELINE" model, should I model the

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 23, 2013, 8:04 pm

Core & Shell: Electricity Use

CS-2009 EAc6:Green Power
posted by  Marco Abdallah  on 

The electricity use determined by the whole buildinig simulation simulation in EAp2 is including also plug load on the tenant spaces (not part of the core&shell scope of work). Eac6 is automati

3
Default Avatar
LEEDuser Premium Member
1 thumbs up
Thu May 23, 2013, 5:23 pm
6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 23, 2013, 3:32 pm

WC's

CS-2009 WEp1:Water Use Reduction
posted by  CRolim Engenharia  on 

Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 12:38 pm