Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green Data Center

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

Does anyone know about the modeling baseline of the a data center. Can we use 90.1 or do we have to use something else?

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 30, 2013, 4:26 pm

Healthcare Prereq 1 Fixtures and Calcs

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Derek Sylvia  on 

This is my first time doing the LEED paperwork. I'm not sure I'm using all the correct fixtures while filling out prereq 1. Currenly I only have water closets and lavs filled out.

5
Thu May 30, 2013, 11:39 am

EA credit 3.2 & EA Pre-requisite 1- Submetering

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Paola Figueiredo, Newton Figueiredo  on 

Please, We are not pursuing the credit EA - 3.2 - System Level Metering, therefore how can we estimate a project energy consumption divided by categories (for EA Pre-Requisite 1) if it doesn't have

2
Thu May 30, 2013, 7:30 am

EQp2 Residential Buildings that Allow Smoking Testing

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Joanne Sawatzky  on 

Wondering the testing requirements (blower door) for residential buildings that allow smoking in the suites. Do we have to test every suite or just 10% of the first x and 5% of the remaining x?

6
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu May 30, 2013, 1:11 am

Existing renovated and no renovated as part of a CS2009

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

Hi, We our working in a CS2009 project where ca 20% of the total gross area of the building is existing construction and the rest is new contrustion.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2013, 9:46 pm

On Site Renewable energy double dip

NC-2009 EAc6:Green power
posted by  Todd Bundren  on 

My client is producing enough energy on-site (solar) to get all the points in EAc1 and EAc2 with a large surplus of renewable energy.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2013, 3:43 pm

Re: Review Comments with Phantom Requirements

General forums
posted by  David Posada  on 

Michelle - see the reply to your post at EQp2: https://www.leeduser.com/credit/NC-v2.2/EQp2#comment-22021

16
Director of LEED Support
U.S. Green Building Council
LEEDuser Premium Member
25 thumbs up
Wed May 29, 2013, 2:21 pm

Meaning of "Ready to Use Products"

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Abdulrahman Sherazy  on 

Hello Colleagues, I have an epoxy coating for flooring with VOC content

3
Wed May 29, 2013, 2:19 pm

Radiant Floor Heating with Natural Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

Hi Group, I have a project with only Radiant Floor Heating with Natural Ventilation. I have modeled both baseline and proposed with the baseline HVAC for cooling (the missing system).

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed May 29, 2013, 8:30 am

identify preferential sites

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  gabriel Morales  on 

Our project developed, we have an underground parking garage, where 100% of the places will be operated by robotic systems. How do we identify preferential sites for LEED credits? regards,

5
Tue May 28, 2013, 10:09 pm