Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EQp2 Residential Buildings that Allow Smoking Testing

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Joanne Sawatzky  on 

Wondering the testing requirements (blower door) for residential buildings that allow smoking in the suites. Do we have to test every suite or just 10% of the first x and 5% of the remaining x?

6
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu May 30, 2013, 1:11 am

Existing renovated and no renovated as part of a CS2009

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

Hi, We our working in a CS2009 project where ca 20% of the total gross area of the building is existing construction and the rest is new contrustion.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2013, 9:46 pm

On Site Renewable energy double dip

NC-2009 EAc6:Green power
posted by  Todd Bundren  on 

My client is producing enough energy on-site (solar) to get all the points in EAc1 and EAc2 with a large surplus of renewable energy.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2013, 3:43 pm

Re: Review Comments with Phantom Requirements

General forums
posted by  David Posada  on 

Michelle - see the reply to your post at EQp2: https://www.leeduser.com/credit/NC-v2.2/EQp2#comment-22021

16
Director of LEED Support
U.S. Green Building Council
LEEDuser Premium Member
25 thumbs up
Wed May 29, 2013, 2:21 pm

Meaning of "Ready to Use Products"

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Abdulrahman Sherazy  on 

Hello Colleagues, I have an epoxy coating for flooring with VOC content

3
Wed May 29, 2013, 2:19 pm

Radiant Floor Heating with Natural Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

Hi Group, I have a project with only Radiant Floor Heating with Natural Ventilation. I have modeled both baseline and proposed with the baseline HVAC for cooling (the missing system).

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed May 29, 2013, 8:30 am

identify preferential sites

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  gabriel Morales  on 

Our project developed, we have an underground parking garage, where 100% of the places will be operated by robotic systems. How do we identify preferential sites for LEED credits? regards,

5
Tue May 28, 2013, 10:09 pm

Single building or multiple buildings?

LEED Guidance for Campuses and Multiple Buildings
posted by  Aditi Padki  on 

We are working on a manufacturing plant outside United States.

4
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Tue May 28, 2013, 9:41 pm

Design Outdoor Air Intake much larger than required

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Diana Hill  on 

Hello, we are doing our office project on a tenth floor of an office building. We have two fan coil units which supply outdoor air to the office.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Tue May 28, 2013, 4:59 pm

Table PIf3-3 Total Daily Occupancy

General forums
posted by  Dale Dunnet  on 

I have read several questions/ replies in the forum, but am still unclear. Some background: We have a 70k warehouse attached to a 20k office. The entire facility has 12 FTEs.

6
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Tue May 28, 2013, 3:25 pm