EQp2 Residential Buildings that Allow Smoking Testing
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joanne Sawatzky on
Wondering the testing requirements (blower door) for residential buildings that allow smoking in the suites. Do we have to test every suite or just 10% of the first x and 5% of the remaining x?
Existing renovated and no renovated as part of a CS2009
CS-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
Hi, We our working in a CS2009 project where ca 20% of the total gross area of the building is existing construction and the rest is new contrustion.
On Site Renewable energy double dip
NC-2009 EAc6:Green powerposted by Todd Bundren on
My client is producing enough energy on-site (solar) to get all the points in EAc1 and EAc2 with a large surplus of renewable energy.
Re: Review Comments with Phantom Requirements
posted by David Posada on
Michelle - see the reply to your post at EQp2: https://www.leeduser.com/credit/NC-v2.2/EQp2#comment-22021
Meaning of "Ready to Use Products"
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
Hello Colleagues, I have an epoxy coating for flooring with VOC content
Radiant Floor Heating with Natural Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Hi Group, I have a project with only Radiant Floor Heating with Natural Ventilation. I have modeled both baseline and proposed with the baseline HVAC for cooling (the missing system).
identify preferential sites
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by gabriel Morales on
Our project developed, we have an underground parking garage, where 100% of the places will be operated by robotic systems. How do we identify preferential sites for LEED credits? regards,
Single building or multiple buildings?
posted by Aditi Padki on
We are working on a manufacturing plant outside United States.
Design Outdoor Air Intake much larger than required
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Hill on
Hello, we are doing our office project on a tenth floor of an office building. We have two fan coil units which supply outdoor air to the office.
Table PIf3-3 Total Daily Occupancy
posted by Dale Dunnet on
I have read several questions/ replies in the forum, but am still unclear. Some background: We have a 70k warehouse attached to a 20k office. The entire facility has 12 FTEs.