"If FSC product has recycled content it CAN NOT be include under

NC-2009 MRc7:Certified Wood
posted by  Sara Axon  on 

under MRc7, FSC only in MRc4". We purchased FSC MDF that is mfg.'d with recycled content.

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Jun 25, 2013, 8:37 pm

USGBC Approved Equivalent/Program

General forums
posted by  Peggy White  on 

As indicated in my previous comments on LEEDuser, the 'USGBC Approved Program' is the big dealbreaker for me.

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jun 25, 2013, 5:30 pm

Ventilation By Exhaust air make-up

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Chinthaka Jagodaarachchi  on 

We working on a industrial building where there is an unconditioned dining area for factory workers. This dining area is provided with roof mounted exhaust fans.

5
Tue Jun 25, 2013, 3:48 pm

Entryway systems from undercover parking

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ricardo Sá  on 

I'm working on a project that will have an entrance from an undercover parking below the building.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jun 25, 2013, 3:27 pm

No open Space, just footprint.

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  JOSE R. TAGLE  on 

“We have a project (North Tower) within the site of a project (South Tower), same owner, but each project would have their own certification.

3
Default Avatar
COMMISSIONING & LEED
AKF GROUP
LEEDuser Basic Member
2 thumbs up
Tue Jun 25, 2013, 1:56 pm

Re use of Concrete after slump cone test

NC-2009 MRc4:Recycled Content
posted by  Harish HA  on 

Can anybody suggest way of reuse of concrete generated from slump cone test of concrete and its debries to be reused with in the project site.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Jun 25, 2013, 8:23 am

Do I need to list all the products?

NC-2009 MRc4:Recycled Content
posted by  Jamie Abernethy  on 

I accidentally posted this in the Certified Wood section...If I take the default 45% of contract price for divisions 3-10 just in the concrete and steel my totals are 80% plus for recycled content

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Jun 24, 2013, 9:00 pm

v4 Draft Rating System Documents

General forums
posted by  Michelle Rosenberger  on 

Morning gentlemen, Thanks for the debate presentation. A very good idea. FYI there's a lot more specific info provided above on the No side.

3
Mon Jun 24, 2013, 8:18 pm

Prescriptive vs permanent shading devices or roof overhangs

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jorge Lopez de Obeso  on 

What is the reason for not being an option the prescriptive method in case a project have permanent shading devices or roof overhangs?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Jun 24, 2013, 2:47 pm

sealant applied to clearance between double glazing

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Noriko Nagazumi  on 

Hi, Sealant which is applied to clearance between two glasses of double glazing window sash shall be evaluated for this credit compliance?

3
Mon Jun 24, 2013, 11:04 am