Core & Shell with HVAC as future / CI scopeNC-v4 EAp1: Fundamental commissioning and verificationposted by Stacey Olson on Jun 20, 2018, 12:36 pm
If a project is a cold, dark shell without hot water, can... |
|
Data Commons & PharosProduct Libraries for LEED v4 & v4.1 Material Creditsposted by Tom Lent on Jun 20, 2018, 1:19 pm
For those of you researching chemical hazards: The Chemical Hazard Data Commons referenced in the Pharos description above is now out of beta... |
|
Laminating Adhesives applied off-siteNC-v4 EQc2: Low-emitting materialsposted by Catalyst Partners on Jun 21, 2018, 5:03 pm
For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde. LEEDv4 is less clear on this, but for all we can tell, compliance to the... |
|
Rounding Rules for # of Showers or Bike RacksNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Adrian Arenas on Jun 24, 2018, 7:17 pm
Hello Everyone, We have a project with... |
|
Eligible Diversion MaterialsMid-Rise-v4 MRc3: Construction Waste Managementposted by Kimberly Vermeer on Jun 25, 2018, 2:56 pm
The waste management contractor for one of my projects is providing reports showing waste going to commingled processing companies. Following guidance from the LEED NC approach for construction... |
|
little help about exemple of projects certified as LEED O + M: Existing BuildingsCredit Forumsposted by ANDREZA PASSOS on Jun 25, 2018, 8:29 pm
Hello, someone could help me, I'm writing my dissertation for university and I'm looking for some projects certified as LEED O + M: Existing Buildings, someone knows where I can find projects... |
|
Accessible Floor and Ceiling systemCI-v4 MRc2: Interiors life-cycle impact reductionposted by roma goyal on Jun 26, 2018, 5:04 am
Hello, I would like to know what does "accesible floor and ceiling system" mean? Does it mean suspended ceiling system and raised floor system for 50% of the total floor area. ... |
|
Establishment period for 50% landscape water use reductionNC-2009 WEc1: Water Efficient Landscapingposted by Dimuth Kurukulaarachchi on Jun 26, 2018, 12:20 pm
All mention of establishment periods refer to the no potable water/irrigation case (WEc1 Option 2), but what about for Option 1, 50% non-potable water use reduction? If a 50% reduction in... |
|
Pilot credit- Building Material Human Hazard & Exposure AssessmentRetail-CI-v4 INc1: Innovationposted by Stacey Olson on Jun 26, 2018, 9:22 pm
It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm. Thanks, |
|
Specs for approved roll out mat that is less than 10'-0" in lengthCS-v4 EQc1: Enhanced indoor air quality strategiesposted by Victor Caban-Diaz on Jun 28, 2018, 11:35 am
Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit? |