Topic | Recent |
---|---|
Steel and Regional MaterialsHealthcare-v2009 MRc3: Sustainably sourced materials and productsposted by Catherine Blakemore on Dec 19, 2013, 8:10 am
Can steel count toward the regional materials category? Is it even possible, since the location of where the actual ore was extracted cannot in most cases be traced back to its origin.... Last reply: Catherine Blakemore, Dec 19, 2013, 2:17 pm |
|
Baseline HVAC system for residential buildingNC-2009 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Mar 10, 2014, 1:23 pm
Hello, We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so... Last reply: Marcus Sheffer, Mar 12, 2014, 6:31 pm |
|
Total Gross Area: does the roof area counts?CS-2009 PIf2: Project Summary Detailsposted by Gabriella DUva on Mar 11, 2014, 11:50 am
When calculating the "Total Project Building Gross Area" required by the PI form 2: does the... Last reply: Medinah Rashid, Dec 7, 2022, 12:41 pm |
|
ADA showerheadNC-2009 WEp1: Water Use Reductionposted by Lisa Marshall on Mar 14, 2014, 4:59 pm
Our project has 2 out of 10 shower stalls that are considered ADA shower stalls. They consist of having a fixed 1.0 gpm shower head and a diverter valve to switch to the 1.125 gpm hand held... Last reply: Michelle Robinson Schwarting, Mar 17, 2014, 3:11 pm |
|
Gas powered equipmentCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Mike D on Mar 21, 2014, 12:26 pm
Is equipment that is powered by gas (such as gas cookers, fryers, ovens) to be included in the list as well or should we just include electrical equipment? Last reply: Michelle Rosenberger, Jan 29, 2019, 4:51 pm |
|
Submetering for AHUs with multiple tanentsCS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Jatuwat Varodompun on Mar 24, 2014, 7:48 pm
We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor. 1. My understanding is that we need to provided "only the central system" which allow tanant... Last reply: Marcus Sheffer, Mar 26, 2014, 9:00 am |
|
Multiple buildings with common basementLEED Guidance for Campuses and Multiple Buildingsposted by Katherine Mariano on Mar 27, 2014, 4:47 am
Hi, I just want to know your opinion regarding the possibility of applying campus credits on multiple buildings with common basement. Have any of you experienced certifying this... Last reply: Emmanuel Pauwels, Jan 26, 2015, 12:47 pm |
|
Audio Visual Equipment part of prerequisite?CI-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Apr 1, 2014, 10:39 am
Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc? Last reply: Marcus Sheffer, Apr 3, 2014, 7:08 pm |
|
Environmental Labs in office buildingEBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Victoria Bauer on Apr 1, 2014, 1:41 pm
Hi there, Last reply: Michael Smithing, Apr 2, 2014, 2:58 am |
|
Changing the TimelineLiving with LEED Online - quirks, bugs and hiccupsposted by Charles Nepps on Apr 5, 2014, 3:17 am
After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review. If I change to a combined review, will that... Last reply: Barry Giles, Apr 8, 2014, 12:34 pm |