Log in
Forum
Topic

Steel and Regional Materials

Healthcare-v2009 MRc3: Sustainably sourced materials and products
posted by Catherine Blakemore on Dec 19, 2013, 8:10 am

Can steel count toward the regional materials category?

Is it even possible, since the location of where the actual ore was extracted cannot in most cases be traced back to its origin....

Last reply: Catherine Blakemore, Dec 19, 2013, 2:17 pm

Baseline HVAC system for residential building

NC-2009 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on Mar 10, 2014, 1:23 pm

Hello,

We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so...

Last reply: Marcus Sheffer, Mar 12, 2014, 6:31 pm

Total Gross Area: does the roof area counts?

CS-2009 PIf2: Project Summary Details
posted by Gabriella DUva on Mar 11, 2014, 11:50 am

When calculating the "Total Project Building Gross Area" required by the PI form 2: does the...

Last reply: Medinah Rashid, Dec 7, 2022, 12:41 pm

ADA showerhead

NC-2009 WEp1: Water Use Reduction
posted by Lisa Marshall on Mar 14, 2014, 4:59 pm

Our project has 2 out of 10 shower stalls that are considered ADA shower stalls. They consist of having a fixed 1.0 gpm shower head and a diverter valve to switch to the 1.125 gpm hand held...

Last reply: Michelle Robinson Schwarting, Mar 17, 2014, 3:11 pm

Gas powered equipment

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Mike D on Mar 21, 2014, 12:26 pm

Is equipment that is powered by gas (such as gas cookers, fryers, ovens) to be included in the list as well or should we just include electrical equipment?

Last reply: Michelle Rosenberger, Jan 29, 2019, 4:51 pm

Submetering for AHUs with multiple tanents

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Jatuwat Varodompun on Mar 24, 2014, 7:48 pm

We have an hi-rise office building with Chiller and AHUs system. We plan to 3 AHUs per floor.

1. My understanding is that we need to provided "only the central system" which allow tanant...

Last reply: Marcus Sheffer, Mar 26, 2014, 9:00 am

Multiple buildings with common basement

LEED Guidance for Campuses and Multiple Buildings
posted by Katherine Mariano on Mar 27, 2014, 4:47 am

Hi,

I just want to know your opinion regarding the possibility of applying campus credits on multiple buildings with common basement.

Have any of you experienced certifying this...

Last reply: Emmanuel Pauwels, Jan 26, 2015, 12:47 pm

Audio Visual Equipment part of prerequisite?

CI-2009 EAp2: Minimum Energy Performance
posted by Saju Varghese on Apr 1, 2014, 10:39 am

Does audio visual equipment need to be included into the appliances requirements including projectors, speakers, led display, interactive displays, etc?

Last reply: Marcus Sheffer, Apr 3, 2014, 7:08 pm

Environmental Labs in office building

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Victoria Bauer on Apr 1, 2014, 1:41 pm

Hi there,
I am working on LEED certification for an office building that has environmental labs. The janitorial staff are required to clean the corridors, offices and break room within the...

Last reply: Michael Smithing, Apr 2, 2014, 2:58 am

Changing the Timeline

Living with LEED Online - quirks, bugs and hiccups
posted by Charles Nepps on Apr 5, 2014, 3:17 am

After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review. If I change to a combined review, will that...

Last reply: Barry Giles, Apr 8, 2014, 12:34 pm