Log in
Forum
Topic

90% Individual Controls

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Farah A. on Feb 23, 2014, 4:42 pm

With the 90% individual controls requirements, does this apply only to workstations?

What about private offices and training rooms? Are these included in the 90% or are they part of '...

Last reply: Lauren Sparandara, Feb 24, 2014, 5:12 pm

Disposers not allowed under WEc4 2009 but ok in healthcare??

Schools-2009 WEc4: Process water use reduction
posted by Suzanne Painter-Supplee, LEED AP+ID&C on Mar 5, 2014, 3:30 pm

Question: There is a disposer standard under LEED for Healthcare, water usage 3-8 gpm in active use. Disposers are not allowed in schools earning this credit, yet I continue to see them...

Last reply: Renee Shirey, Jun 24, 2014, 8:22 pm

Future Building as a Shadowing Element

NC-2009 EAp2: Minimum Energy Performance
posted by Gabriela Crespo on Mar 5, 2014, 5:08 pm

Dear all,

We are working on a single building certification that is located within a two tower project. I will call the building to be certified Tower 1 and the building located to the...

Last reply: Marcus Sheffer, Mar 6, 2014, 3:43 pm

Ceramic Tiles only

CS-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Habitech Distretto Tecnologico Trentino on Nov 21, 2013, 5:25 am

Hi!
We are working on a LEED CS v2009 where only ceramic tiles (flooring+wall base) will be installed as part of the CS scope of works.
Since tiles are exempt from this credit and no...

Last reply: Tristan Roberts, Dec 20, 2013, 6:03 pm

Eap2 and Ea1

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Ana Paula Quiros on Nov 25, 2013, 2:40 pm

We are working on a medical center in Mexico to be certified LEED...

Last reply: Eric Johnson, Nov 27, 2013, 2:32 am

Termic coating- where to fit?

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Marcio Alberto Casado Pereira on Dec 5, 2013, 7:49 am

We have a product that will be used on the metal piping of a power generator. The piping will become hot during use, therefore the coating needs to be resistant to the heat.

Not sure what...

Last reply: Susan Walter, Dec 6, 2013, 1:18 pm

Offsite Renewable Energy

NC-2009 EAc1: Optimize Energy Performance
posted by Dave Hubka on Dec 6, 2013, 10:23 am

Our project will have a biofuel system that utilizes agricultural crops as the biofuel. Per the LEED reference guide this is considered to be...

Last reply: Scott Bowman, Dec 10, 2013, 2:41 pm

Naturally ventilated offices- mild temperate climate-loads unmet

NC-2009 EAp2: Minimum Energy Performance
posted by Paul Overy on Dec 11, 2013, 11:32 am

We have a narrow plan 3 storey naturally ventilated building with radiators (baseboard) in temperate Ireland. Some windows are user controlled and some controlled by the BMS, with night purge...

Last reply: Marcus Sheffer, Dec 11, 2013, 1:16 pm

Energy Star Portfolio Manager

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Kelly Webb on Dec 11, 2013, 1:57 pm

We are working on a multi tenant project and during our performance period the owner lost a large tenant. The tenant loss is not large enough to put the project in jeopardy of qualifying for...

Last reply: Eric Anderson, Sep 9, 2014, 7:05 pm

Speciality

EBOM-v4 INc2: LEED Accredited Professional
posted by Ralf Lehmann on Dec 18, 2013, 5:18 am

Is a LEED AP BD+C also eligible for earning the credit under...

Last reply: SoYoung Lee, Sep 29, 2014, 8:30 pm