Entry Mats: Interior or Exterior?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Saju Varghese on
Reading the reference guide, they say the following: "Incorporate permanent entryway system at all high-traffic exterior to interior access points to reduce...", also "employ permanent entryway sys
Modeling the envelope
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
Two short questions about modeling the envelope: 1. For my proposed model, am I required to follow the tables from appendix A even when my project is outside the US?
Share your lessons learned at Greenbuild
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Mara Baum on
I am co-chairing a Greenbuild presentation, "LEED for Healthcare: Lessons Learned from the First 3 Years".
Centrally metering network
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ron Dean on
I'm working on a residential project that doesn't have a centrally monitored metering network.
Regularly occupied
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adrienn Gelesz on
Hi, according to ID#100000426 MADE ON 07/19/2010, the wording changed from: "In mechanically ventilated buildings, install new air filtration media in regularly occupied areas prior to occupancy.
53000 SF in LEED Boundary
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
We have been contracted to do the fundamental commissioning for a college building that we also designed.
Cant find 2.1(b) and c()
Homes-v2008 IDc2:Durability management processposted by david harrington on
4.Incorporate the measures from 2.1(b) and (c), above, into project documents (drawings, specifications, and/or scopes of work, as appropriate).
Ergonomics Strategy IEQpc44 - Question on CIR 2238 Wording
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Krystle Thomsen on
When I was researching this credit, I used CIR 2283. Under requirements, it states that the "strategy must include the five components listed below".
EAc6 Implementation
NC-2009 EAc6:Green powerposted by Cassandra Kail on
Does the project need to purchase Green Power from its power provider (it is provided), or is there the option of purchasing RECs on the open market from other providers (given that costs may be ch
VOCs in Prefabricated buildings
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Therese Malm on
Hi, I'm working on a building which is largely made out of units which are prefabricated off site.